Educational Facilities

Elementary

Sossaman and Elona Middle School

Location
  • Gilbert, Arizona

Year Completed
  • 2013

SUMMARY

HVAC, plumbing, and electrical engineering services for the design of the two new 145,000 Middle Schools in the Higley Unified School District. Construction completed in 2013.

Lower Buckeye Elementary School

Location
  • Buckeye, Arizona

Year Completed
  • 2010

SUMMARY

HVAC, plumbing, and electrical services for ADA Restroom Upgrades in Buildings 200, 300, and 400 at the Lower Buckeye Elementary School in the Buckeye Union School District. Construction in progress.

Remodeling of Franklin School at Brimhall Junior HS

Location
  • Mesa, Arizona

Year Completed
  • 2012

SUMMARY

HVAC, plumbing, fire protection, and electrical engineering for the remodeling of Classrooms, Restrooms, Nurses Office, Cafeteria and additions of new Restrooms at the Brimhall Junior High School in Mesa, Arizona. Construction completed in 2012.

Williams Elementary School Structural Strengthening

Location
  • Williams, Arizona

Year Completed
  • 2012

SUMMARY

HVAC, plumbing, fire protection, and electrical engineering services for the design to assist the structural strengthening of the roof support at the Williams Elementary School in Williams, Arizona. Redesigned the natural gas piping serving the entire campus and sized for low pressure gas. Construction scheduled completed in 2012.

Science Classroom Remodel for Beaver Creek Elementary School

Location
  • Rimrock, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical engineering service for the remodel of the existing 1,400 S.F. Science Classroom at Beaver Creek Elementary School in the Beaver Creek School District. Construction completed in 2011.

Buckeye Lower Campus Pre-School

Location
  • Buckeye, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical engineering services for the design of a new administration building (10,000 SF approximately) that will have a kitchen and three (3) new classroom buildings (6,000 SF approximately each). Construction completed in 2011.

Buckeye Elementary Lower Campus

Location
  • Buckeye, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, fire protection, and electrical engineering services for the remodel of the kitchen and six student restrooms at the Buckeye Elementary School Lower Campus in the Buckeye School District. Construction completed in 2011.

Riverside Elementary School Additions

 


Location
  • Phoenix, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical services for the additions of two (2) new buildings, Building 900, (4,300 SF approximately) and Building 1000, (700 SF approximately) at the Riverside Elementary School in the Riverside School District. Construction completed in 2011.

Buckeye Elementary School Remodel

 

 


Location
  • Phoenix, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical engineering services for the remodel of the 91,000 SF Buckeye Elementary School in the Buckeye School District. Construction completed in 2011.

Riverside Elementary School

Location
  • Phoenix, Arizona

Year Completed
  • 2010

SUMMARY

HVAC, plumbing, and electrical engineering services for the remodel of Buildings 200 (7,700 SF), 300 (7,500 SF), 400 (7,500 SF), 600 (14,300 SF), and 700 (6,750 SF) at the Riverside Elementary School in the Riverside School District. The design of site lighting including the new parking lights, power provision for the new Musco lighting for the existing ball fields, power for the new sign and marquee and power to the new automatic gate. Construction completed in 2010.

Solano Elementary School HVAC Replacement and Restroom Remodel

Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 30,000 SF remodel and replacement of the HVAC equipment, the remodel of the existing restrooms, and a 5,100 SF addition at the existing Solano Elementary School in the Osborn School District. Construction completed in 2009.

Osborn Middle School Chiller Replacement and Restroom Remodel

 


Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new Energy Management Controls, a new 165 ton chiller and the remodel of the existing restrooms at the 88,000 SF Osborn Middle School in the Osborn School District. Construction completed in 2009.

Clarendon Elementary School HVAC Replacement and Restroom Remodel

 


Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 30,000 SF remodel and replacement of the HVAC equipment, the remodel of the existing restrooms, and a 3,300 SF addition at the Clarendon Elementary School in the Osborn School District. Construction to be completed in 2009.

Renovations/Additions to Dysart Elementary School #1

 


Location
  • El Mirage, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing, and electrical design services for the existing 71,000 SF Dysart Elementary School #2, including the 5,200 SF remodeled Administration Area and the new 24,000 SF addition in the Dysart Unified School District. Construction completed in 2009.

Montecito Elementary School Multi-Purpose Addition

 


Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 7,800 SF Multi-Purpose Building Addition at the existing Montecito Elementary School in the Osborn School District. Construction completed in 2009.

New Centennial Elementary School for Higley Unified School District No. 80

 


Location
  • Gilbert, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new 112,000 SF elementary school in the Higley Unified School District. Construction completed in 2009.

Modifications to Mechanical Systems at Webster Elementary School

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the replacement of the existing water cooled chiller and cooling tower with a new water cooled chiller and cooling tower to serve the approximately 41,000 SF Webster Elementary School in the Mesa Unified School District. Construction completed in 2009.

Hendrix Jr. High School Chiller Replacement

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the replacement of two existing water cooled chillers and cooling towers with 2 new water cooled chillers and cooling towers to serve approximately 106,000 SF Classroom Building at Hendrix Jr. High School in the Mesa Unified School District. Construction completed in 2009.

O’Connor Elementary School HVAC Upgrades

Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and electrical engineering services for the replacement of two water cooled chillers with a single water cooled chiller and the replacement of the two cooling towers with two new cooling towers at O’Connor Elementary School in the Mesa Unified School District. Construction to be completed in 2009.

Kino Jr. High School Multizone Unit Replacement

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and electrical engineering services for the replacement of 6 multizone air handling units, 1 single zone air handling unit, and adding packaged rooftop Computer Room units to serve the main Classroom Building at Kino Jr. High school in the Mesa Unified School District. Construction to be completed in 2009.

Shepherd Elementary School Air Handling Unit Replacement

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and electrical engineering services for the replacement of 2 rooftop air handling units, 112 fan coil units, and 4 packaged rooftop gas/electric air conditioning units at the 154,000 SF Shepherd Junior High School in the Mesa Unified School District. Construction to be completed in 2009.

Desert Springs Elementary School Admin Remodel and Fire Alarm Design

Location
  • Paradise Valley, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for an approximately 3,700 SF Remodel of the Administration Area of the Classroom Building and a complete fire alarm system design for all of the buildings on site, including the Classroom Building, the Multipurpose Building, Kindergarten Building and two (2) portable Classroom Buildings totaling approximately 50,500 SF, in the Paradise Valley Unified School District. Design completed in 2008.

Village Vista Elementary School Admin Remodel and Fire Alarm Design

 


Location
  • Paradise Valley, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for an approximately 3,700 SF Remodel of the Administration Area of the Classroom Building and a complete fire alarm system design for all of the buildings on site, including the Classroom Building, the Multipurpose Building, and two (2) portable Classroom Buildings totaling approximately 59,500 SF, in the Paradise Valley Unified School District. Design completed in 2008.

Modifications to Mechanical Systems at Webster Elementary School

 


Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the replacement of the existing water cooled chiller and cooling tower with a new water cooled chiller and cooling tower to serve the approximately 41,000 S.F. Webster Elementary School for the Mesa Unified School District, in Mesa, Arizona.

Dysart Elementary School #19

 


Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and plumbing design for a new elementary school approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2008.

Dysart Elementary School #20

 


Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2008.

Luke Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and plumbing design for a new K-8 elementary school approximately 110,000 SF in the Dysart Unified School District. Construction completed in 2008.

Countryside Elementary School

 


Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

Electrical engineering design services for ball field lighting at Countryside Elementary School in the Dysart Unified School District. AZPE designed and specified all distribution panelboards, lighting control and new pole-mounted lighting fixtures for the ball fields. Construction completed in 2008.

Alma Elementary School Heat Pump Replacement

 


Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for the replacement of the existing 24 heat pump units serving 45,000 SF Alma Elementary School in the Mesa Unified School District. Construction completed in 2007.

MPS Mesa Academy for Advanced Studies (World Prep Academy)

Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing, and electrical design services for a new 40,000 SF advanced studies school for grades 4 thru 9 for Mesa Public Schools in Mesa, Arizona. The facility includes classrooms, a media center, an administrative area, a science lab, and a large multipurpose room. Construction completed in 2007.

Salk Elementary School Classroom Building

Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for a 14 Classroom Building at Salk Elementary School in the Mesa Unified School District. Construction completed in 2007.

Stevenson Elementary School Classroom Building

Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for a 14 Classroom Building at Stevenson Elementary School in the Mesa Unified School District. Construction completed in 2007.

Dysart Elementary School #18

 


Location
  • El Mirage, Arizona

Year Completed
  • 2007

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction to be completed in 2007.

Peoria Elementary School #31

 


Location
  • Peoria, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for the new 122,000 GSF, K-8 School in the Peoria Unified School District. This school has a Classroom Building, Multipurpose Building and Remote Restroom Building. Design to be completed in 2007.

Carson Jr. High School

Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for the replacement of the existing three air cooled chillers and six air cooled condensing units with 2 new water-cooled chillers and cooling towers to serve Carson Junior High School in the Mesa Unified School District. The existing fan coil units and chiller water piping to be replaced with new fan coil units with electric heat to eliminate the boilers and 2-pipe change over system. The air conditioning units to be removed and replaced with chilled water fan coil units with electric heat in the Cafeteria, Music, PE and Media Buildings. A new campuswide building automation system (BAS) to be installed that is comparable with the District BAS. Construction to be completed in 2007.

Dysart Elementary School #17

Location
  • El Mirage, Arizona

Year Completed
  • 2007

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction to be completed in 2007.

Dysart Elementary School #16

Location
  • El Mirage, Arizona

Year Completed
  • 2007

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction to be completed in 2007.

Kino Jr. High School

 


Location
  • Mesa, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical design for the replacement of two existing cooling towers serving Kino Junior High School in the Mesa Unified School District. Construction completed in 2006.

Taylor Jr. High School A/C Units Replacement

Location
  • Mesa, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical design for the replacement of the 16 existing air conditioning units serving Taylor Junior High School in the Mesa Unified School District. Design completed in 2006.

World Prep Academy

Location
  • El Mirage, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical design for the new 40,000 SF alternative school with classrooms, media center and large multipurpose room in the Mesa Unified School District. Design completed in 2006.

Dysart Elementary School #15

Location
  • El Mirage, Arizona

Year Completed
  • 2006

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. The water-cooled chilled water central plant also serves the adjacent 33,000 SF Preschool. Construction completed in 2006.

New Cave Creek Middle School

Location
  • Cave Creek, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing, and electrical design for a new single story middle school of approximately 104,000 SF in the Cave Creek Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Cafeteria, Kitchen, Snack Bar, Wrestling, Boys and Girls Locker Rooms, Weight Room, Health Room, and Special Education Rooms. It also included three single-story Academic Building with Classrooms, an Administrative Building, and a Media Center with a Library, Computer Classrooms, Video Production, Teachers Lounge, Bookstore, RTC Classroom, Art Room, Music Room, and Lecture Classroom with Stage. The HVAC system consists of a water-cooled chilled water central plant (built as part of the New Cave Creek Elementary School), fan coil units with electric heat, and a building automation system (BAS). Construction completed in 2006.

Peoria Elementary #30

Location
  • Peoria, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 105,600 SF in the Peoria Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Locker Rooms, Band Room, Choral Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction to be completed in 2005.

Greer Ranch Elementary School #14

Location
  • El Mirage, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2005.

Rancho Gabriella Elementary School #13

Location
  • El Mirage, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2005.

MPS Curriculum Services Building AHU Replacement

Location
  • Mesa, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and electrical design services for the replacement of two (2) large multizone air conditioning units and various other HVAC upgrades at the Curriculum Services Building in Mesa, Arizona for the Mesa Unified School District. Construction completed in 2005.

New Cave Creek Elementary School

Location
  • Cave Creek, Arizona

Year Completed
  • 2005

SUMMARY

HVAC, plumbing, and electrical design for a new two story elementary school of approximately 85,000 SF in the Cave Creek Unified School District. The school included a single-story Multipurpose Building with P.E., Cafeteria, Kitchen, Band Room, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Building, Kindergarten Classroom Building, and Media Building. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The central plant was sized to accommodate the future Middle School. Construction to be completed in 2005.

Carden Charter School

Location
  • Surprise, Arizona

Year Completed
  • 2005

SUMMARY

HVAC, plumbing, and electrical design to remodel 6,000 square foot area of a Charter School located in Surprise, Arizona. The remodel consists of combining 2 smaller restroom groups into a single larger restroom group, and deleting one classroom to create a 4,000 square foot gathering area. This large gathering area was lighted using ceiling hung indirect light fixtures. The HVAC system consists of packaged rooftop heat pump units. Construction to be completed in 2005.

Surprise Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2005.

MPS New Preschool Campus

Location
  • Mesa, Arizona

Year Completed
  • 2004

SUMMARY

HVAC, plumbing, and electrical design for eight (8) relocated portable classrooms and two (2) ramada areas for the New Preschool Campus for Mesa Public Schools in Mesa, Arizona. Design completed in 2004.

Thompson Ranch Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2004

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2004.

Sierra Montana Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2004

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2004.

New El Mirage Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2004

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2004.

Cimmaron Springs Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2004

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 93,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2004

American Elementary (Remodel)

Location
  • Glendale, Arizona

Year Completed
  • 2003

SUMMARY

HVAC design for the mechanical system upgrades for 37,000 SF of classroom space at American Elementary in the Glendale Elementary School District. Design included replacing several large packaged rooftop units with pneumatic controls with new smaller units dedicated to each classroom. Construction completed in 2003.

Bicentennial North Elementary (Remodel)

Location
  • Glendale, Arizona

Year Completed
  • 2003

SUMMARY

HVAC design for the mechanical system upgrades for 2,500 SF of classroom space at Bicentennial North Elementary in the Glendale Elementary School District. Design included replacing several large packaged rooftop units with pneumatic controls with new smaller units dedicated to each classroom. Construction completed in 2003.

Portable Addition to Sharp and EMECEC

Location
  • Mesa, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing, and electrical design for four (4) relocated portable classroom buildings at Sharp and EMECEC Schools in the Mesa Unified School District. Construction completed in 2003.

Horizon Elementary (Remodel)

Location
  • Glendale, Arizona

Year Completed
  • 2003

SUMMARY

HVAC design for the mechanical system upgrades for 24,000 SF of classroom space at Horizon Elementary in the Glendale Elementary School District. Design included replacing several large packaged rooftop units with pneumatic controls with new smaller units dedicated to each classroom. Construction completed in 2003.

Mesa Public Schools Portable Buildings

Location
  • Mesa, Arizona

Year Completed
  • 2003

SUMMARY

Replace existing air conditioning units with new high-efficiency rooftop air conditioning units utilizing demand based ventilation for 30 portable classrooms at Franklin Northeast Elementary School, 14 portable classrooms at McKellips Learning Center, 12 portable classrooms at Taft Elementary School, and 18 portable classrooms at Whitman Elementary School in the Mesa Unified School District. Construction completed in 2003.

Ashton Ranch Elementary

Location
  • El Mirage, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 102,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Music Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2002.

Peoria Elementary School #29

Location
  • Peoria, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design for a new elementary school of approximately 98,000 SF in the Peoria Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Kitchen, Locker Rooms, Band Room , Choral Room, and Art Room. It also included a two-story Academic Building with Classrooms, Administrative Office and Media Center. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium utilizes demand-based ventilation control for energy efficiency. Design completed in 2002.

Mesa Public Schools Classroom Buildings

Location
  • Mesa, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design for a new 12,000 SF Classroom Building at Taft, Whitman, Roosevelt, and Lindberg Elementary Schools in the Mesa Unified School District. The HVAC system utilized high-efficiency rooftop air conditioning units with demand-based ventilation control. Construction completed in 2002.

Lone Mountain Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design for a new two story elementary school of approximately 85,000 SF in the Cave Creek Unified School District. The HVAC system consists of chilled water cooling fan coil units with electric heat, water-cooled chilled water central plant, and DDC controls. Construction completed in 2002.

Johnson Elementary School

Location
  • Mesa, Arizona

Year Completed
  • 2002

SUMMARY

Replace the existing packaged rooftop variable volume air conditioning units with new packaged rooftop variable volume air conditioning units sized to accommodate the Code required quantities of outside air at the 43,000 SF Johnson Elementary School in the Mesa Unified School District. Replace the existing pneumatic control system with a new direct digital control system. Design completed in 2002.

McKellips Learning Center

Location
  • Mesa, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design for a new 2,600 SF Multipurpose Building at McKellips Learning Center in the Mesa Unified School District. The HVAC system utilized high-efficiency rooftop air conditioning units. Construction completed in 2002.

Stapley Jr. High School

Location
  • Mesa, Arizona

Year Completed
  • 2002

SUMMARY

Provide Code required outside air for the existing 72,000 SF Stapley Jr. High School in the Mesa Unified School District. The outside air ventilation system utilized fan powered air-to-air heat exchangers to temper the new Code required quantities of outside air. The ventilation system included new galvanized outside air ductwork and relief air ductwork distributed to each classroom. Design completed in 2002.

Kingswood Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2002

SUMMARY

Provide Code required outside air for the existing 86,000 SF Kingswood Elementary School in the Dysart Unified School District. The outside air ventilation system utilized fan powered air-to-air heat exchangers to temper the new Code required quantities of outside air. The ventilation system included new galvanized outside air ductwork and relief air ductwork distributed to each classroom. Construction completed in 2002.

Kerr Elementary School

Location
  • Mesa, Arizona

Year Completed
  • 2002

SUMMARY

Provide Code required outside air for the existing 58,000 SF Kerr Elementary School in the Mesa Unified School District. The outside air ventilation system utilized fan powered air-to-air heat exchangers to temper the new Code required quantities of outside air. The ventilation system included new galvanized outside air ductwork and relief air ductwork distributed to each classroom. Design completed in 2002.

El Mirage Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2002

SUMMARY

Replace the existing packaged rooftop heat pump units with new packaged rooftop heat pump units sized to accommodate the Code required quantities of outside air for 22 classrooms. HVAC and plumbing design for a new 6,400 SF Classroom addition including 6 new classrooms utilizing new high efficiency heat pump units. Remodel 7 existing restrooms including replacement of the existing plumbing fixtures and piping with 53 new plumbing fixtures and corresponding piping. Replace the existing evaporative coolers serving the 1,600 SF Kitchen with new high efficiency heat pump units for the El Mirage Elementary School in the Dysart Unified School District. Construction completed in 2002.

Surprise Elementary School

Location
  • Surprise, Arizona

Year Completed
  • 2002

SUMMARY

Replace the existing packaged rooftop heat pump units with new high efficiency packaged rooftop heat pump units sized to accommodate the Code required quantities of outside air for 15 classrooms. Remodel 4 existing restrooms including replacement of the existing plumbing fixtures and piping with 37 new plumbing fixtures and corresponding piping. Replace the existing evaporative coolers serving the 2,500 SF Kitchen with new high efficiency heat pump units for the Surprise Elementary School in the Dysart Unified School District. Construction completed in 2002.

Countryside Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design for a new two story elementary school of approximately 93,000 SF in the Dysart Elementary School District. The HVAC system consists of chilled water cooling fan coil units with electric heat, water cooled chilled water central plant, and DDC controls. Construction completed in 2002.

Dysart Elementary School

Location
  • El Mirage, Arizona

Year Completed
  • 2002

SUMMARY

Remodel the existing restrooms including replacement of the existing plumbing fixtures and piping with 19 new plumbing fixtures and associated piping for the Dysart Elementary School in the Dysart Unified School District. Construction completed in 2002.

American Elementary (Remodel)

Location
  • Glendale, Arizona

Year Completed
  • 2003

SUMMARY

HVAC design for the mechanical system upgrades for 37,000 SF of classroom space at American Elementary in the Glendale Elementary School District. Design included replacing several large packaged rooftop units with pneumatic controls with new smaller units dedicated to each classroom. Construction completed in 2003.

Bicentennial North Elementary (Remodel)

Location
  • Glendale, Arizona

Year Completed
  • 2003

SUMMARY

HVAC design for the mechanical system upgrades for 2,500 SF of classroom space at Bicentennial North Elementary in the Glendale Elementary School District. Design included replacing several large packaged rooftop units with pneumatic controls with new smaller units dedicated to each classroom. Construction completed in 2003.

Horizon Elementary (Remodel)

Location
  • Glendale, Arizona

Year Completed
  • 2003

SUMMARY

HVAC design for the mechanical system upgrades for 24,000 SF of classroom space at Horizon Elementary in the Glendale Elementary School District. Design included replacing several large packaged rooftop units with pneumatic controls with new smaller units dedicated to each classroom. Construction completed in 2003.

High School

Peoria High School Cafeteria Restroom Remodel

Location
  • Peoria, Arizona

Year Completed
  • 2011

SUMMARY

Plumbing and electrical engineering services for the 500 SF Cafeteria Restroom Remodel at Peoria High School in the Peoria Unified School District. Construction completed in 2011.

Cafeteria Restroom Remodel at Peoria High School for the Peoria Unified School District

Location
  • Peoria, Arizona

Year Completed
  • 2011

SUMMARY

Plumbing and electrical engineering services for the 500 SF Cafeteria Restroom Remodel at Peoria High School in the Peoria Unified School District. Construction completed in 2011.

Buckeye District Office Cooling and Heating Load Calculations

Location
  • Buckeye, Arizona

Year Completed
  • 2011

SUMMARY

HVAC engineering services for the preparation of the cooling and heating load calculation for the new 19,000 SF Buckeye District Office Building in the Buckeye School District.

Mountain View High School Classroom Building

Location
  • Mesa, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical engineering services for a new 35,000 SF Classroom Building at Mountain View High School in Mesa Public School District. Construction completed in 2011.

Red Mountain High School Classroom Building

 


Location
  • Mesa Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical engineering services for the new 47,000 SF Classroom Building at Red Mountain High School in the Mesa Public School District. Construction completed in 2011.

Mesa High School HVAC Replacement

 


Location
  • Mesa Arizona

Year Completed
  • 2011

SUMMARY

HVAC and electrical engineering services for the replacement of existing packaged rooftop air conditioning units serving the 55,000 SF Gymnasium Building, the 40,000 SF Auditorium Building, and the 22,500 SF Classroom Building with chilled water fan coil and air handling units at the Mesa High School for the Mesa Unified School District, in Mesa, Arizona.

Mesa High School Classroom Building

 


Location
  • Mesa, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, and electrical engineering services for the Site Adaptation of a new 35,000 SF Classroom Building at Mountain View High School in the Mesa Public School District. Construction completed in 2011.

Buckeye High School Academy

Location
  • Buckeye, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing and electrical engineering services for a new 31,776 S.F. Academy Building at Buckeye High School in the Buckeye Union High School District #201.

Buckeye Union High School District Stand-by Generators

Location
  • Buckeye, Arizona

Year Completed
  • 2011

SUMMARY

Plumbing engineering services for the addition of a stand-by generator at Buckeye High School, Youngker High School, and Estrella Foothills High School in the Buckeye Union High School District.

Glendale High School Culinary Building

Location
  • Glendale, Arizona

Year Completed
  • 2010

SUMMARY

HVAC and plumbing engineering services for the 5,200 SF Culinary Building at Glendale High School in Glendale, Arizona. AZPE designed and specified a make-up air system, Type 1 and Type 2 kitchen exhaust fans and ductwork for the Culinary Kitchen and a completed HVAC system for the remainder of the building. Design to be completed in 2010.

Westwood High School HVAC Upgrades

Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the replacement of two water cooled chillers with a single water cooled chiller at the Administration Building, the replacement of one water cooled chiller with two water cooled chillers in the new Packaged Central Plant, the replacement of the existing multizone air handling unit serving the cafeteria Building, the replacement of 2 air handling units serving the Auditorium, and the replacement of the four (4) rooftop packaged air conditioning units serving the Gym Locker Rooms with four (4) new rooftop chilled water air handling units at the Westwood High School in the Mesa Unified School District. Construction completed in 2009.

APS Incentive Submittals for Dysart High School #4

Location
  • El Mirage, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical service for the preparation of an APS Incentives Submittal for Dysart High School #4. AZPE prepared energy analysis simulations to determine the annual cost savings of the plate and frame heat exchangers in accordance with ASHRAE methodology. AZPE also prepared all APS Incentives “Prescriptive” documents for the Incentives Program. Documents completed in 2009.

Performing Arts Center at Valley Vista High School

Location
  • El Mirage, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new 60,000 SF Auditorium at Valley Vista High School in the Dysart Unified School District. Construction completed in 2009.

Cortez High School Metal Shop Upgrades

Location
  • Glendal, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 2,775 SF Metal Shop Upgrades at Cortez High School in the Glendale Unified High School District. Construction completed in 2009.

Independence High School Culinary Remodel

Location
  • Glendale, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 3,785 SF remodel of the Culinary Area at Independence High School in the Glendale Union High School District. Design included a supplemental HVAC system for the Culinary Kitchen using rooftop chilled-water air handling units with a gas-fired heating section in each. Construction completed in 2009

Moon Valley High School Culinary Remodel

 


Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 3,600 SF Culinary Remodel at Moon Valley High School in the Glendale Union High School District. Design included a make-up air system for the Culinary Kitchen using rooftop chilled-water air handling units with a hot water heating section in each. Construction completed in 2009.

Red Mountain High School Chiller & A/C Unit Replacement

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and electrical engineering services for the replacement of two existing 250 ton water cooled chillers serving the 145,000 square foot Classroom Building with two new Smardt Turbo Core chillers and the 20 packaged rooftop air conditioning units serving the 55,000 square foot Gymnasium Building with 20 new units at Red Mountain High School for the Mesa Unified School District, in Mesa, Arizona.

Apollo High School Culinary Remodel

 


Location
  • Glendale, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the 3,600 SF Culinary Remodel at Apollo High School in the Glendale Union High School District. Design included a make-up air system for the Culinary Kitchen using rooftop chilled-water air handling units with a hot water heating section in each. Construction completed in 2009.

Thunderbird High School Remodel

Location
  • Glendale, Arizona

Year Completed
  • 2009

SUMMARY

HVAC engineering services for the remodel of a Career Center, Conference Room, and a Photography Classroom totaling 2,240 SF at Thunderbird High School in the Glendale Union High School District. Construction completed in 2009.

Westwood High School Kitchen Remodel

Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the 9,300 SF remodel of the Cafeteria Dining Area which included the revised 2,000 SF Kitchen Serving Area, the new 800 SF Restroom addition, the new 300 SF Snack Shop Addition, and the remodeled Outdoor Dining Canopy Area for Westwood High School in the Mesa Unified School District. Construction completed in 2008.

Willow Canyon High School Ball Field Lighting

Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

Electrical engineering design services for ball field lighting at Willow Canyon High School in the Dysart Unified School District. AZPE designed and specified all distribution panelboards, lighting control and new pole-mounted lighting fixtures for the ball fields. Construction completed in 2008.

Dysart High School #4

Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and plumbing design for a new high school of approximately 225,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Locker Rooms, Weight Room, Wrestling Room, Kitchen, Cafeteria, Music Room, Art Room and Auditorium. It also included 2 separate two-story Classroom Buildings, and Administrative Office Building, and Media Building. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium and Auditorium utilizes demand-based ventilation control for energy efficiency. Construction to be completed in 2008.

Peoria High School New Admin/Media Center

Location
  • Peoria, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the new Administration Building and Media Center with a combined floor area of approximately 18,000 SF at Peoria High School in the Peoria Unified School District. Construction completed in 2008.

Valley Vista New Classroom Building

Location
  • El Mirage, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the new 38,500 SF Classroom Building at Valley Vista High School in the Dysart Unified School District. Construction completed in 2008.

Mountain View High School Classroom Building

Location
  • Peoria, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for a new 26 Classroom Building at Mountain View High School in the Mesa Unified School District. Construction completed in 2007.

Peoria High School Culinary Arts

Location
  • Peoria, Arizona

Year Completed
  • 2007

SUMMARY

HVAC and plumbing design for the 3,400 SF remodel of the Main Kitchen and the 5,900 SF addition to the Cafeteria Building for the new Culinary Arts Kitchen and Restrooms at Peoria High School in Peoria, Arizona. Construction to be completed in 2007.

Mountain View High School Weight Room Addition

Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, fire protection and electrical engineering services for a new Weight Room Addition to the Varsity Athletics Building at Mountain View High School in the Mesa Unified School District. Design completed in 2007.

Peoria High School Chilled Water Loop & Central Plant Expansion

Location
  • Peoria, Arizona

Year Completed
  • 2007

SUMMARY

HVAC design services to build-out the Central Plant and complete the chilled water loop at Peoria High School in Peoria, Arizona. Construction to be completed in 2007.

Westwood High School Buildings 500 & 600

Location
  • Mesa, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical design for the replacement of the 3 existing chilled water air handling units and 1 multi-zone unit with new air conditioning units serving Buildings 500 & 600 at Westwood High School in the Mesa Unified School District, utilizing demand-based ventilation control for energy efficiency. Both buildings were provided with a building automation system (BAS) compatible with the existing camps BAS. Construction completed in 2006.

Portable Building Additions to Mesa Public Schools

Location
  • Mesa, Arizona

Year Completed
  • 2006

SUMMARY

Electric design for Longfellow Elementary School Campus, Smith Jr. High, Zaharis Elementary, Posten Jr. High, and the Stapley Bus Barn Campuses in the Mesa Public School District. Construction completed in 2006.

Dysart High School Remodel

 


Location
  • El Mirage, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and plumbing design to remodel the existing 225,000 SF high school in the Dysart Unified School District. This project included a new 61,000 SF Classroom Building, a new 31,000 SF Media Building, a new 38,000 SF Gymnasium/Locker Room Building, a new 23,000 SF Cafeteria Building, a 16,000 SF Fine Arts Addition, a 12,000 SF Administration Addition to the existing Auditorium Building and the remodeling of the old Gymnasium. The HVAC system consists of two water-cooled packaged central plants. Construction completed in 2005.

Dysart High School Remodel

 


Location
  • El Mirage, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and plumbing design to remodel the existing 225,000 SF high school in the Dysart Unified School District. This project included a new 61,000 SF Classroom Building, a new 31,000 SF Media Building, a new 38,000 SF Gymnasium/Locker Room Building, a new 23,000 SF Cafeteria Building, a 16,000 SF Fine Arts Addition, a 12,000 SF Administration Addition to the existing Auditorium Building and the remodeling of the old Gymnasium. The HVAC system consists of two water-cooled packaged central plants. Construction completed in 2005.

Peoria High School Chilled Water Loop & Central Plant ExpansionWestwood High School Classroom Building HVAC Retrofit

Location
  • Mesa, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and electrical design to replace 5 existing chilled-water, multi-zone air handling units in the 92,000 SF Classroom Building in Mesa, Arizona. This project included resizing the replacement multi-zone units to properly condition new computer rooms within the building. Air-to-air heat exchangers were provided to accommodate the additional outside air required by current Codes. The project also included adding a redundant chilled and condenser water pumps to the existing Central Plant. Construction completed in 2005.

Mesa High School Orchestra Room Addition

Location
  • Mesa, Arizona

Year Completed
  • 2005

SUMMARY

HVAC, plumbing and electrical design for a new 2,300 SF Orchestra Room at Mesa High School in Mesa, Arizona. Construction completed in 2005.

Mesa High School Athletic Building Addition

Location
  • Mesa, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing and electrical design for the 1,600 SF Girl’s Locker/Shower Addition at Mesa High School in Mesa, Arizona. Construction completed in 2003.

Willow Canyon High School

Location
  • El Mirage, Arizona

Year Completed
  • 2003

SUMMARY

HVAC and plumbing design for a new high school of approximately 225,000 SF in the Dysart Unified School District. The school included a single-story Multipurpose Building with Gymnasium, Locker Rooms, Weight Room, Wrestling Room, Kitchen, Cafeteria, Music Room, Art Room and Auditorium. It also included 2 separate two-story Classroom Buildings, an Administrative Office Building, and Media Building. The HVAC system consists of a water-cooled chilled water central plant, fan coil units with electric heat, a hydronic economizer, and a building automation system (BAS). The Gymnasium and Auditorium utilizes demand-based ventilation control for energy efficiency. Construction completed in 2003.

Dobson High School P.E. Building

Location
  • Mesa, Arizona

Year Completed
  • 2003

SUMMARY

HVAC and plumbing design for a new 9,800 SF Physical Education Building as Dobson High School in the Mesa Unified School District. The project included a Weight Room, Classroom, Locker/Shower Rooms, and Athletic Department Offices. The HVAC system utilized high-efficiency air conditioning units. A gas-fired boiler with two (2) large storage tanks provided domestic hot water for the facility. Construction completed 2003.

Dysart High School

Location
  • El Mirage, Arizona

Year Completed
  • 2003

SUMMARY

Replace the existing packaged rooftop heat pump units with new high efficiency packaged rooftop heat pump units sized to accommodate the Code required quantities of outside air for 33 classrooms. HVAC and plumbing design for a new 8,200 SF Library addition including 8 new classrooms utilizing new high efficiency heat pump units. Remodel 3 existing restrooms including replacement of the existing plumbing fixtures and piping with 31 new plumbing fixtures and corresponding piping. Replace the existing evaporative coolers and heat pump unit serving the Auto shop with new high efficiency evaporative coolers and heat pump unit for the Dysart High School in the Dysart Unified School District. Construction completed in 2003.

Maricopa High School

 


Location
  • Maricopa, Arizona

Year Completed
  • 2003

SUMMARY

HVAC and plumbing design for a new 5,200 SF Kitchen and Cafeteria utilizing new high efficiency heat pump units. Remodel 2 existing restrooms including replacement of the existing plumbing fixtures and piping with 3 new plumbing fixtures and corresponding piping. Replace the existing evaporative coolers serving the 1,000 SF Restroom Core with a new high efficiency heat pump unit for the Maricopa High School in the Maricopa Unified School District. Construction completed in 2003.

College

ASU Evaluation of 25 Buildings

Location
  • Tempe, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing, fire protection and electrical systems assessments to identify, describe, and estimate the cost of deferred maintenance items with respect to the mechanical and electrical systems in 25 buildings on ASU’s Main Campus. This included field visits, report writing and cost estimating. Projects would be selected by the University as part of a 4-year stimulus program. Evaluations completed in 2008.

University of Phoenix Cafe TI

Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical design for a 1,500 SF tenant improvement of a Cafe in University of Phoenix’s new building in Phoenix, Arizona. Construction completed in 2008.

ASU SES Lunar Sciences

Location
  • Tempe, Arizona

Year Completed
  • 2006

SUMMARY

HVAC and electrical design for the SES Lunar Sciences Renovation at the Administration Building Wing “A” at Arizona State University Main Campus in Tempe, Arizona. Construction completed in 2006.

ASU West CLC IT Server Room

Location
  • Phoenix, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing, fire protection and electrical design for the 1,500 SF IT Server Room tenant improvement in an unfinished basement area of the CLC Building at ASU’s West Campus in Phoenix, Arizona. Construction completed in 2006.

ASU Main Campus Great Hall Upgrades

Location
  • Tempe, Arizona

Year Completed
  • 2006

SUMMARY

HVAC and electrical design for upgrades at the ASU College of Law, Great Hall Building at ASU’s Main Campus in Tempe, Arizona. Construction completed in 2006.

ASU Material Services Remodel

Location
  • Tempe, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing, fire protection, and electrical design for the remodel of the 13,024 SF Material Services Building at the Arizona State University (ASU) Main Campus in Tempe, Arizona. Construction completed in 2006.

ASU East Static Flight Simulator Addition

Location
  • Mesa, Arizona

Year Completed
  • 2005

SUMMARY

HVAC, fire protection, and electrical design for the 1,020 SF Static Flight Simulator Addition at Arizona State University East Campus (ASU-East) in Mesa, Arizona. Construction completed in 2005.

ASU Engineering Building Wing "F"

Location
  • Tempe, Arizona

Year Completed
  • 2005

SUMMARY

HVAC, plumbing and electrical design for the 3,768 SF remodel of the East Portion of the Engineering Building Wing “F” at the Arizona State University (ASU) Main Campus in Tempe, Arizona. Construction completed in 2005.

ASU East Nursing Remodel

Location
  • Mesa, Arizona

Year Completed
  • 2004

SUMMARY

HVAC, plumbing and electrical design for the 8,130 SF Phase 2 Nursing Remodel at Arizona State University East Campus (ASU-East) in Mesa, Arizona. Construction completed in 2004.

ASU W.P. Carey Technical MBA TI

Location
  • Tempe, Arizona

Year Completed
  • 2004

SUMMARY

HVAC, plumbing, fire protection, and electrical design for the remodel of 4,600 SF of cafeteria space in Arizona State University’s Flexible Display Center at the ASU Research Park in Tempe, Arizona. The new layout includes Classrooms, Staff Offices, and Student Break-out Rooms. Construction completed in 2004.

ASU Central Plant Control Room Remodel

Location
  • Tempe, Arizona

Year Completed
  • 2004

SUMMARY

HVAC, plumbing, and electrical design for the remodel of the Main Central Plant Control at Arizona State University in Tempe, Arizona. The project included a main Control Room with Support Offices and a Conference Room. Construction completed in 2004.

ASU Dixie Gammage Hall Evaluation

Location
  • Tempe, Arizona

Year Completed
  • 2004

SUMMARY

HVAC, plumbing, and electrical evaluation of the historic 21,500 SF Dixie Gammage Hall at Arizona State University in Tempe, Arizona. The project assessed the economics of remodeling the facility into a office building complying with ASU’s standards for life safety and indoor environment. Evaluation completed in 2004.

ASU East Campus Quad 2 Remodel

Location
  • Mesa, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing, and electrical design for the remodel of Quad 2 for the Cashier and Student OASIS at the Arizona State University East Campus in Mesa, Arizona. Construction competed in 2003.

ASU East Campus HSC Classroom Remodel

Location
  • Mesa, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing, fire protection, and electrical design for the 5,900 SF remodel of the HSC Classroom at the Arizona State University East Campus in Mesa, Arizona. The project included patient care rooms for training students in the College of Nursing. Construction completed in 2003.