Fire Station Projects

City of Mesa Fire Station No. 220

 


Location
  • Mesa, Arizona

Year Completed
  • 2010

SUMMARY

HVAC, plumbing and electrical engineering services for a new 11,900 SF 3-bay Fire Station No. 220 in Mesa, Arizona. AZPE performed computerized energy modeling of the building envelope, HVAC systems, plumbing systems and lighting systems to establish a base-line energy consumption and to estimate the energy savings for various LEED-eligible modifications. All applicable LEED documentation was also provided. Design completed in 2010.

City of Mesa Public Safety Training Facility

 


Location
  • Mesa, Arizona

Year Completed
  • 2010

SUMMARY

HVAC, plumbing and electrical engineering services for the new City of Mesa Public Safety Training Facility at Virginia and Greenfield Road in Mesa, Arizona. The project included 22,412 SF of New Public Safety Training Building, 2,468 SF Remodel to offices, 1,312 SF addition of offices, 1,608 SF remodel/HVAC upgrade to locker rooms, and site lighting for new parking. Design completed in 2010.

Goodyear Police & Fire Department Administration Building TI

 

 

 

 


Location
  • Goodyear, Arizona

Year Completed
  • 2014

SUMMARY

HVAC  and electrical engineering services for the tenant improvement (TI) of 4,400 SF (approximately) at the Police and Fire Department Administration Building in Goodyear, Arizona.

Old Cottonwood Fire Station HVAC Upgrades

 


Location
  • Cottonwood, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the design of HVAC upgrades to the Old Cottonwood Fire Station in Cottonwood, Arizona. Design included modifications to the existing HVAC system using unitary air conditioning equipment and evaporative cooling for the Ambulance Bays. Design completed in 2009.

City of Mesa Fire Station No. 210 Exhaust Fans

 


Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and electrical design for new exhaust fans and gravity hoods in the apparatus bays for Fire Station No. 210 in Mesa, Arizona. Construction completed in 2008.

City of Mesa Fire Station No. 209 Remodel

 


Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and electrical engineering services for the remodel of a portion of Fire Station No. 209 in Mesa, Arizona. The remodel included conversion of the garage space into dorm and office space. Construction completed in 2008.

Cottonwood Fire Station HVAC Evaluation

Location
  • Cottonwood, Arizona

Year Completed
  • 2008

SUMMARY

Evaluation of the Heating, Ventilating and Air Conditioning (HVAC) System at the Old Cottonwood Fire Station near Mingus Avenue and Sixth Street in Cottonwood, Arizona. Evaluation completed in 2008.