High Tech, Cleanroom, & Industrial Projects

W.L. Gore Phoenix 3/Learning Center Expansion

 


Location
  • Phoenix, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing and electrical engineering services for a new 130,000 SF Production/Storage Facility (Phoenix 3) and a new 30,000 SF Learning Center at the W.L. Gore and Associates Phoenix Campus located in Phoenix, Arizona.

Empire Southwest CRC Building Schematic Design

 


Location
  • Mesa, Arizona

Year Completed
  • 2012

SUMMARY

HVAC, plumbing and electrical engineering services for the Schematic Design for the new CRC Building to be located on the Empire Southwest Mesa Campus.

Honeywell Union Hills Facility Relocation/Exit Project

 


Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing, fire protection and electrical engineering services for the relocation of the Honeywell Union Hills Facility in Phoenix, Arizona. The total remodeled area in the Deer Valley Facility is 135,000 SF. Design modifications included the existing building’s HVAC system, process piping to the special equipment and electrical design for special power requirements for the lab equipment and distribution system. This was a fast-track project with design completed in mid 2009 and construction to be completed in early 2010.

W.L. Gore Medical West Mechanical Systems Upgrade

 


Location
  • Flagstaff, Arizona

Year Completed
  • 2015

SUMMARY

HVAC, plumbing and electrical engineering services for a Base Design of a complete mechanical system as outlined in the report prepared by AZPE entitled “HVAC System Evaluation for W.L. Gore and Associates, Inc., Medical West Facility”. The facility is located in Flagstaff, Arizona.

Tenant Improvement for Arizona Nutritional Supplements

 


Location
  • Phoenix, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical engineering services for the design of the tenant improvements for Arizona Nutritional Supplements’ new 83,500 SF facility. This includes approximately 40,000 SF of manufacturing space, 20,000 SF of office space on a new mezzanine, and 40,000 SF of warehouse space.

GoDaddy Tempe Call Center TI

Location
  • Tempe, Arizona

Year Completed
  • 2013

SUMMARY

HVAC, plumbing and electrical design services for a new, approximately 150,000 square foot call center located in the ASU Research Park in Tempe Arizona. Design to be completed in 2013.

IO Data Centers Module Factory

Location
  • Tempe, Arizona

Year Completed
  • 2012

SUMMARY

HVAC, plumbing and electrical design services for a factory for production of the IO Data Centers Power and Data Modules. Design was completed in 2012 and construction was completed in 2012.

SRP POB Central Plant Upgrades FY10

Location
  • Phoenix, Arizona

Year Completed
  • 2010

SUMMARY

HVAC and electrical engineering services for the FY10 Central Plant Upgrades at the Salt River Project POB Facility. This included the design of a 235-ton chiller, cooling tower, chilled water pump, condenser water pump and centrifugal separator-type cooling tower basin cleaning system to replace existing equipment in the Central Plant. Construction completed in 2010.

SRP EVSC Cooling Tower Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and electrical design for the replacement of the cooling towers at the Salt River Project (SRP) East Valley Service Center (EVSC). AZPE designed piping and equipment layouts for the replacement of the Client-Furnished cooling towers and basin filtration system. AZPE also indicated the removal and reconnection of the motors and controllers for the cooling towers and basin filtration system. Construction completed in 2009.

Medtronic Buildings 3 & 4 Chilled Water Interconnection

Location
  • Tempe, Arizona

Year Completed
  • 2009

SUMMARY

HVAC engineering services for the design of a chilled water interconnection to enable Building #3 and 3A to be supplied with chilled water from the Central Plant in Building #4 at the Medtronic Facility in Tempe, Arizona. Construction completed in 2009.

W.L. Gore EO Sterilization/Warehouse Building

Location
  • Flagstaff, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing, process piping and electrical engineering services for the 10,000 SF Ethylene Oxide (EO) Sterilization/Warehouse Building at W.L. Gore’s Kiltie Lane Campus in Flagstaff, Arizona. Project also included a 6,000 SF addition to the building which will house packaging equipment, a conference room, a cafeteria and shipping/receiving areas. AZPE developed a commissioning plan with test procedures to verify the operation of the mechanical and electrical systems as well as performed on-site functional testing the of the HVAC control system to verify the automatic temperature controls were properly programmed to execute the critical sequences of operation. Construction to be completed in 2009.

Empire Southwest Apache Junction Facility

Location
  • Apache Junction, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new 50,310 SF Empire Facility in Apache Junction, Arizona. This project included 35,431 SF heavy equipment service building, a 7,679 SF remote wash facility, and a 7,200 SF heat/beat shed. Construction completed in 2009.

General Dynamics H-1216 Phoenix SCIF Remodel

Location
  • Scottsdale, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing, fire protection and electrical engineering services for the H-1216 SCIF Remodel at the General Dynamics C4 Systems Hayden Campus in Scottsdale, Arizona. The H-1216 Engineering & Lab Project consisted of an Office Area, Conference Room, Shield Room, Lan Closet, Shield Room and Lab Area. Construction completed in 2009.

Empire Southwest Deer Valley Facility

Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new 29,900 SF Empire Deer Valley Facility in Phoenix, Arizona. This project included a 27,600 SF heavy equipment service building and a 2,300 SF remote wash facility. Construction to be completed in 2009.

SRP EVSC Chilled Water System and Thermal Storage System Assessment

Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC engineering services to assess the existing chilled water system and thermal storage system at Salt River Project’s (SRP’s) East Valley Service Center at 7050 E. University Drive in Mesa, Arizona. AZPE evaluated the performance of the thermal storage system by comparing the capacity of the chilled water storage system with the actual need for chilled water based on recorded hourly building load profiles. AZPE examined the water pressure drops in the chilled water system (hydraulic analysis) and used this information to evaluate the piping and pumping system. Construction to be completed in 2009.

Timken Turbine Engine Repair Facility

Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and plumbing engineering services for the Phase I Tenant Improvements at the 43,000 SF Turbine Engine Repair Facility in Mesa, Arizona for Timken Alcor Aerospace Technologies. The facility was located in a virgin shell warehouse building. The HVAC system was designed for Class 100,000 space with unitary rooftop air conditioning units.

Medtronic Building #3 Chilled Water Study

Location
  • Tempe, Arizona

Year Completed
  • 2008

SUMMARY

HVAC engineering services to determine the feasibility of supply chilled water to Building #3 from the Building #4 Central Plant. AZPE analyzed operational data provided by Medtronic for the existing chillers and chilled water pumps to determine whether the Building #4 Central Plant can meet the needs of Building #3 and Building #4 simultaneously. Study completed in 2008.

Armor Designs Phase 1 Build-Out

Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, process piping and electrical engineering services for the Phase 1 Build-Out of Armor Designs facility in Phoenix, Arizona. The Phase 1 Build-Out included the Shooting Range, two (2) new hydraulic presses, a 4,000 SF class 100,000 cleanroom, a Quality Control Lab, and a coating, mix and grinding area. Design completed in 2008.

SRP Power Operations Building Expansion Study

Location
  • Scottsdale, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and electrical study prepared for Salt River Project to determine the feasibility of adding a 25,000 SF expansion to the existing 58,000 SF Power Operations Building in Scottsdale, Arizona. This study included an analysis of the existing dual, redundant chilled water central plants, and the normal and back-up power sources with recommendations for their expansion. Construction to be completed in 2008.

SRP ISB Cooling Tower Replacement

Location
  • Tempe, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing, and electrical design for the replacement of two 800-ton cooling towers at Salt River Project’s Information Systems Building (ISB) in Tempe, Arizona. This project included pre-purchase of the cooling towers, condenser water pumps and variable frequency drives, and design of a new ground level cooling tower yard in order to remove the towers from the roof of the building. Control system modifications and installation of a tower cleaning system were also included. Design achieved switchover to new cooling towers with minimal interruption of chilled water plant operation. Construction completed in 2006.

ON Semiconductor Cooling Tower Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 2006

SUMMARY

HVAC and electrical design for replacement of a 1,100-ton single-cell cooling tower with a new 1,100-ton two-cell cooling tower serving two 550-ton chillers in Building “D” at the ON Semiconductor Facility at 52nd Street and McDowell in Phoenix, Arizona. Design included piping, control and electrical distribution modifications to allow each cell to be operated with either chiller. Construction completed in 2006.

SRP West Valley Service Center Cooling Tower Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and electrical design for replacement of a 400-ton two-cell cooling tower at Salt River Project’s West Valley Service Center in Phoenix, Arizona. Design included piping, control, and electrical distribution modifications to allow each cell to be operated with either chiller. Construction completed in 2006.

Pine Towers Public Housing Elevator Modernization

 


Location
  • Phoenix, Arizona

Year Completed
  • 2006

SUMMARY

HVAC and electrical design for the modernization of a single hydraulic elevator in the Pine Towers public housing complex. This project included relocation of the existing hydraulic pump into a new Elevator Equipment Room complete with new cooling system and electrical service. Construction completed in 2006.

Medtronic Building 2 Remodel

 


Location
  • Tempe, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and engineering services for the 15,000 SF remodel of the Building 2, Class 100,000 cleanroom at Medtronic’s facility in Tempe, Arizona.

Security Building North Bank Elevator Modernization

 


Location
  • Phoenix, Arizona

Year Completed
  • 2005

SUMMARY

HVAC design for the modernization of 3 traction elevators in the Security Building in downtown Phoenix, Arizona. DHMW was the prime consultant for this project. This project included new cab interiors, new elevator controls, drives, and upgrades to the Elevator Equipment Room including the installation of a redundant cooling system. Construction completed in 2005.

SRP West Valley Service Center Chiller Replacement

 


Location
  • Phoenix, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and electrical design for the replacement of two 270-ton chillers, refrigeration machinery room upgrades to achieve compliance with current code, and a control system upgrade for the central plant, at Salt River Project’s West Valley Service Center in Phoenix, Arizona. This project also included commissioning of the new central plant equipment and control system. This project was completed with minimal interruption to the normal operation of the facility through construction phasing. Construction completed in 2005.

SRP 27th Street Facility Chiller Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 2005

SUMMARY

HVAC and electrical design for the replacement of a 150-ton chiller and 300-ton cooling tower, refrigeration machinery room upgrades to achieve compliance with current code, and a control system upgrade for the central plant, at Salt River Project’s 27th Street Facility in Phoenix, Arizona. This project also included commissioning of the new central plant equipment and control system. This project was completed with minimal interruption to the normal operation of the facility through the use of a temporary chiller. Construction completed in 2005.

National Gypsum Company SES Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 2005

SUMMARY

Electrical design for the replacement of an existing 2,500 ampere service entrance section with a new 3,000 ampere service entrance section and distribution section at National Gypsum’s manufacturing facility in Phoenix, Arizona. This project included fault current analysis and overcurrent device coordination with the remaining on-site equipment. This project was completed with minimal interruption to the facilities 24 hour operations through construction phasing and the use of temporary generators. Construction completed in 2005.

Monier Lifetile Facility Addition, Henderson

Location
  • Henderson, Nevada

Year Completed
  • 2005

SUMMARY

HVAC, plumbing, and electrical engineering services for electrical service upgrades and building expansion of the existing Monier Lifetile roofing tile factory in Henderson, Nevada. The expansion included a new production building of approximately 9,500 SF, a new laboratory of approximately 375 SF and a new SPID room. Construction completed in 2005.

Maricopa County Lower Buckeye Jail Central Plant Expansion

Location
  • Phoenix, Arizona

Year Completed
  • 2005

SUMMARY

Mechancial and electrical design for a 10,000 SF expansion to the existing central plant located in Phoenix, Arizona. The design included planning for the future build-out of the 5,000 ton chiller plant. The installation of a new 1,000 ton, 4,160 volt, chiller, a 1,000 ton cooling tower, as well as the electrical systems to support the final build-out were included as part of this project. The new chiller and tower were interconnected to the existing chilled and condenser water systems. The design also included the installation of a new 700 horsepower boiler in the existing boiler plant. Construction completed in 2005.

SRP Tempe Service Center

Location
  • Tempe, Arizona

Year Completed
  • 2004

SUMMARY

HVAC, plumbing, and fire protection design for the Salt River Project’s, Tempe Service Center. This included a new 24,000SF Warehouse Building with offices, a remodel of an existing 11,918 SF Warehouse Building, along with a study to determine the cost-effectiveness of converting two existing buildings to chilled-water air conditioning. The project also included the design of a 279 ton Chilled Water Central Plant with expansion capacity to 558 tons. Construction completed in 2004.

Bank-One Operations Center Fault Current Study and Circuit Breaker Coordination

Location
  • Phoenix, Arizona

Year Completed
  • 2003

SUMMARY

A complete Fault Current Study was performed in SKM Power Engineering Software to identify available fault current at each electrical system bus. Then a Circuit Breaker Coordination was performed and electronic trip unit settings were specified for all of the overcurrent devices in the electrical system. Study completed in 2003.

Motorola Tempe SSRC Labs Relocation

Location
  • Phoenix, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing and process piping for the 2850 SF remodel of the Motorola Tempe Facility to accommodate the SSRC Labs Relocation. This project included design and specification of a solvent and acid ductwork for the relocated tools and design of relocation of the existing dust collection system for the Wet Lab. Additionally design and specification of the process piping distribution systems for the relocated tools, including hydrogen, oxygen, CDA, nitrogen, process vacuum, argon, helium, DI water and industrial waste was performed. Construction completed in 2003.

Motorola WBSG Lab Relocation

Location
  • Tempe, Arizona

Year Completed
  • 2003

SUMMARY

Electrical and fire alarm design for the relocation of an existing lab to the Motorola SPS site in Tempe, Arizona. The design included 4800 square feet of production area including remodel replacement of all lighting and addition of new distribution and branch wiring to support new work stations. Construction completed in 2003.

Motorola VCMP Lab Relocation

Location
  • Tempe, Arizona

Year Completed
  • 2003

SUMMARY

Electrical and fire alarm design for the relocation of a video production lab to the Motorola SPS site in Tempe, Arizona. The design required integration of a Power Distribution Unit to provide clean power to the critical loads and an extensive raceway system for signal cabling. Construction completed in 2003.

BOC-Edwards Parts Clean Room

Location
  • Phoenix, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing and process piping design for a 1,400 SF Tenant Improvement including 326 SF of Class 100 Cleanroom at the Watkins Street, BOC Edwards Kachina Facility in Phoenix, Arizona. The HVAC design included a 7,500 cfm single-pass air-conditioning and exhaust, energy recovery system. Construction (except Cleanroom) completed in 2003.

MycroSENSOR Technologies TI

Location
  • Phoenix, Arizona

Year Completed
  • 2003

SUMMARY

HVAC, plumbing and process piping design for the Tenant Improvement of 12,000 SF of manufacturing space including 730 SF of Class 100 Cleanroom and 600 SF of Class 1,000 Cleanroom at MycroSENSOR Technologies Facility in Phoenix, Arizona. Construction completed in 2003.

Goodrich, Universal Propulsion Company

Location
  • Phoenix, Arizona

Year Completed
  • 2002

SUMMARY

Design of HVAC system upgrades for a 650 SF propellant mixing building to maintain strict temperature and humidity control in the Goodrich, Universal Propulsion Company Facility in Phoenix, Arizona. Design completed in 2002. Construction not funded.

Medtronic Building 4 Cleanroom Expansion

Location
  • Tempe, Arizona

Year Completed
  • 2002

SUMMARY

HVAC, and process piping design for a 296 SF expansion of a Class 1 Cleanroom and 1,200 SF of new Class 1,000 Cleanroom in Building #4 at the Medtronic Facility in Tempe, Arizona. This project included verification of existing utilities, and design of new tool hook-ups to the existing acid and solvent exhaust systems, process cooling water, DI water, solvent drain, nitrogen and clean-dry air systems. Construction completed in 2002.

Pillsbury Bakery Plumbing

Location
  • Tempe, Arizona

Year Completed
  • 2001

SUMMARY

As-built the plumbing systems for a 67,000 SF bakery/shipping center in Tempe, Arizona. This project included field verification of the locations and sizes of all exposed plumbing systems including building waste and vent, domestic cold and hot water, natural gas piping and compressed air piping. This information was then entered into an AutoCad drawing for use by the Owner. Project completed in 2001.

Motorola Roosevelt Campus, Building #22 Chiller Replacement

Location
  • Scottsdale, Arizona

Year Completed
  • 2002

SUMMARY

HVAC and plumbing design of a new 106 ton water-cooled chiller, along with a new cooling tower, chilled water pump, and condenser water pump in Building #22 at the Motorola Hayden Campus in Scottsdale, Arizona. This project also involved the relocation of an industrial air compressor and the construction of new sound-attenuating, fire-rated partitions to segregate the chiller from the remainder of the Building. A special exhaust and cooling system was added to meet new building code requirements. DHM was the prime consultant on this multi-discipline project. Construction completed in 2002.

ATMI Cleanroom Addition

Location
  • Tempe, Arizona

Year Completed
  • 2001

SUMMARY

HVAC design for the 160 SF expansion of the Class 100 cleanroom at the ATMI facility in Tempe, Arizona. This project also included the addition of two (2) new EPI reactors plus provisions for seven (7) future EPI reactors. Construction completed in 2001.

Medtronic Buildings #1 & #2 Remodel

Location
  • Tempe, Arizona

Year Completed
  • 2002

SUMMARY

HVAC, plumbing, and process piping design for the complete renovation of 43,700 SF of floor space in Buildings #1 & #2 at the Medtronic facility in Tempe, Arizona. This includes approximately 30,000 SF of Class 100,000 cleanroom assembly space and 13,700 SF of office/support space. Construction completed in 2002.

Medtronic Building #4 Remodel

Location
  • Tempe, Arizona

Year Completed
  • 2001

SUMMARY

HVAC, plumbing, and process piping design for the remodel of 15,500 SF of Class 100,000 cleanroom testing space on the ground floor of Building #4 at the Medtronic facility in Tempe, Arizona. Construction completed in 2002.

Motorola Mesa Campus, VARA 1 Exhaust Fan Replacement

Location
  • Mesa, Arizona

Year Completed
  • 2001

SUMMARY

HVAC design for the replacement of three (3) existing 10,000 CFM solvent laden air (SLA) exhaust fans, and the addition of one (1) new standby exhaust fan. This included the design of a new fan sequencing and static pressure control system for the VARA 1 solvent abatement system. DHM was the prime engineer on this multi-discipline engineering project. Construction completed in 2001.

Motorola Mesa Campus, Building 300 Chiller Addition

Location
  • Mesa, Arizona

Year Completed
  • 2000

SUMMARY

HVAC design of a new 500 ton low temperature glycol chiller in Building #300 at the Motorola facility in Mesa, Arizona. The design also included a new cooling tower, primary chilled water pump, secondary chilled water pump. And a new vertical turbine type condenser water pump. Design completed in 2000.* Construction not funded.

Motorola Hayden Campus, Area H-1177 & 1182 Remodel

Location
  • Scottsdale, Arizona

Year Completed
  • 2000

SUMMARY

HVAC design for the remodel of 14,800 SF of manufacturing/office space at the Motorola Hayden Campus in Scottsdale, Arizona. Construction completed in 2000.

Motorola Hayden Campus, Area H-1186 Remodel

Location
  • Scottsdale, Arizona

Year Completed
  • 2000

SUMMARY

HVAC design for the remodel of 7,300 SF of laboratory/office space at the Motorola Hayden Campus in Scottsdale, Arizona. Construction completed in 2000.

Motorola Mesa Campus, Calibration Lab Remodel

Location
  • Mesa, Arizona

Year Completed
  • 2000

SUMMARY

HVAC and process piping design for the 4000 SF remodeling of Building 101 at the Motorola facility in Mesa, Arizona to accommodate the relocation of the Calibration Lab. Construction completed in 2000.

Motorola Mesa Campus, Steam Condensate Return System

Location
  • Mesa, Arizona

Year Completed
  • 2000

SUMMARY

HVAC design for a new steam condensate return system for Modules 1, 2, 5, 6, 9 and 10 (approximately 90,000 SF total). Also included was the preparation of prepurchase specifications for the new condensate return pumps. Individual condensate pumps in each Module transported steam condensate to a main condensate transfer system where the condensate was then collected and pumped to the Central Steam Plant. Construction completed in 2000.

Motorola Mesa Campus, Mod 8 Acid Scrubbers

Location
  • Mesa, Arizona

Year Completed
  • 2000

SUMMARY

HVAC and plumbing design for a pair of 20,000 CFM acid fume Scrubbers for Module 8. Construction completed in 2000.*

Motorola Mesa Campus, MOS 5 Acid Exhaust System

Location
  • Mesa, Arizona

Year Completed
  • 2000

SUMMARY

HVAC and plumbing design for the hook-up of three (3) 80,000 CFM acid fume scrubbers and four (4) acid exhaust fans. The project included the replacement of existing fiberglass exhaust ductwork in basement of MOS 5, without causing a shutdown of the MOS 5 wafer fab. Construction completed in 2000. *

Motorola Mesa Campus, MOS 5 Ammonia Scrubbers

Location
  • Mesa, Arizona

Year Completed
  • 2000

SUMMARY

HVAC design and plumbing design for two (2) 10,000 CFM ammonia fume scrubbers and ammonia exhaust duct system. Construction completed in 2000.*

Olive Partner's Warehouse

Location
  • Mesa, Arizona

Year Completed
  • 1999

SUMMARY

Electrical power, lighting and fire alarm design for a 50,000 square foot warehouse including an electric fire pump for boosting the fire sprinkler system as required by the local authority having jurisdiction. Design and construction completed 1999.*

Motorola Hayden Campus, Cooling Tower Replacement

Location
  • Scottsdale, Arizona

Year Completed
  • 1999

SUMMARY

HVAC and plumbing design for the installation of four (4) new 900 ton cooling towers to replace three (3) existing cooling towers. Construction completed in 1999.*

Motorola Roosevelt Campus, Chiller Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 1999

SUMMARY

HVAC design for the replacement of a 700 ton centrifugal water chiller in the Central Plant. Construction completed in 1999.*

City of Chandler Central Utility Building Chiller Addition

Location
  • Chandler, Arizona

Year Completed
  • 1999

SUMMARY

Electrical design for the installation of a new chiller and gas coolant evacuation system. Design and construction completed in 1999.*

Tucson Newpapers

Location
  • Tucson, Arizona

Year Completed
  • 1999

SUMMARY

Evaluation of the existing electrical distribution and lighting systems at Tucson Newspapers, printing facility in Tucson, Arizona. The evaluation included a feasibility study and cost estimate for the addition of two new printing presses. Evaluation completed in 1999.*

Motorola Roosevelt Campus, Cooling Tower Replacement

Location
  • Phoenix, Arizona

Year Completed
  • 1998

SUMMARY

HVAC and plumbing design for the installation of two (2) 1,000 ton cooling towers to replace an existing three-cell cooling tower. Construction completed in 1998.*

Motorola Mesa Campus, VARA 3 SLA Abatement System

Location
  • Mesa, Arizona

Year Completed
  • 1998

SUMMARY

HVAC and plumbing design for a 40,000 CFM solvent laden air (SLA) exhaust system for MOS 5. The project also included the design of natural gas, RO water, and clean dry air utilities to support an owner-furnished VOC abatement system. Construction completed in 1998.*

Motorola Mesa Emergency Generator Building

Location
  • Mesa, Arizona

Year Completed
  • 1998

SUMMARY

Design of (1) new 2,000 gallon diesel fuel above-ground, steel-lined, concrete-encased fuel storage and piping system for two (2) new 1200 KW emergency generators. Construction completed in 1998.*

Motorola Ocotillo Campus, Building 2 Remodel

Location
  • Chandler, Arizona

Year Completed
  • 1998

SUMMARY

HVAC and process piping design for remodel of approximately 38,000 SF of floor area on the first floor of Building 2 at the Motorola facility in Chandler, Arizona. Construction completed in 1998.*

SRP/Intel

Location
  • Chandler, Arizona

Year Completed
  • 1998

SUMMARY

HVAC design for two (2) 4,200 SF Dynamic Voltage Restorer Buildings for Salt River Project at the Intel facility in Chandler, Arizona. Construction completed in 1998.*

On Semiconductor (Formerly Motorola 52nd Street Campus) Building “P” Central Plant Upgrade

Location
  • Phoenix, Arizona

Year Completed
  • 1997

SUMMARY

HVAC design for the conversion of an 8,000 ton chilled water Central Plant into a true primary/secondary pumping system with variable speed pumps. Construction completed in 1997.*

Honeywell Deer Valley Plant

Location
  • Phoenix, Arizona

Year Completed
  • 1997

SUMMARY

Mechanical engineering services to evaluate and design a supplemental ventilation and cooling system for two (2) environmental test chamber rooms. Construction completed in 1997.*

* Indicates individual project design experience of Steven F. Durand, Rodney L. Hillis, Philip J. Mouw, William Bergman or Scott E. Woods.