Multi-Family, Assisted Living, & Religious Facilities

Fellowship Square Sorpresa

 


Location
  • Surprise, Arizona

Year Completed
  • 2014

SUMMARY

HVAC, plumbing and electrical engineering services for a new senior living complex including 286.2 kSF Building A, 50.4 kSF Building B, a centralized mechanical Central Plant, a pool and pool building and a maintenance and workshop building on about 15 acres located in Surprise, Arizona.

Sante/Holiday Glendale Independent Senior Living Facility

 


Location
  • Glendale, Arizona

Year Completed
  • 2015

SUMMARY

HVAC, plumbing and electrical engineering services for a new 105,000 SF (approx.) 126-unit Independent Senior Living Building, located in Glendale, Arizona.

Mission del Sol Presbyterian Church

 


Location
  • Tempe, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical engineering services for a new 11,000 S.F. Worship Center at the Mission del Sol Presbyterian Church located in Tempe, Arizona.

Chandler Christian Church Remodel

 


Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for a 9000 SF renovation of the Sanctuary, an expansion of the existing platform and a 2400 SF expansion of the existing lobby at Chandler Christian Church in Chandler, Arizona.

Central Christian Church East Valley-North Campus Worship Center Remodel

 


Location
  • Mesa, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical engineering services for the North Campus Worship Center Remodel including relocated AV Room, Gear Room, Dressing Rooms, Baptistery, new Office Area, new exterior Stairwell, new Catwalk, and new Center Screen at the Central Christian Church East Valley in Mesa, Arizona.

City of Mesa Skyline Aquatics Center

 

 

 


Location
  • Mesa, Arizona

Year Completed
  • 2010

SUMMARY

HVAC, plumbing and electrical design for the new Skyline Aquatics Center in Mesa, Arizona. This facility includes a play pool, competition pool, equipment building, and guard house with locker rooms. Construction to be completed in 2010.

Apache Wells Community Center

Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new Apache Wells Community Center in Mesa, Arizona. This project included a 23,968 SF Main Level with Fitness Center/Social Hall/Multipurpose Room/Pro Shop/Kitchen/Bar/Grill, a new 1,000 SF Mechanical Mezzanine and the partial remodel of the existing 6,307 SF Basement. Construction completed in 2009.

City of Mesa Recreation Building Chiller Installation

Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical design for the chiller installation at the City of Mesa Recreation Building in Mesa, Arizona. Construction completed in 2009.

Mesa Amphitheater Lighting Renovation

Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

Electrical engineering services for a renovation of the existing lighting systems at the Mesa Amphitheater in Mesa, Arizona. Construction completed in 2008.

City of Phoenix Youth Center/Theater HVAC

Location
  • Phoenix, Arizona

Year Completed
  • 2007

SUMMARY

HVAC engineering services for ductwork modifications in the Auditorium at the City of Phoenix Youth Center/Theater in Phoenix, Arizona. Design completed in 2007.

University of Phoenix Stadium Data Closet Cooling

Location
  • Glendale, Arizona

Year Completed
  • 2007

SUMMARY

HVAC and electrical engineering for the installation of a ductless split-system air-conditioner in two Data Closets on the Club Level of the University of Phoenix Stadium in Glendale, Arizona. Design completed in 2007.

Sunflower RV Resort - Fitness Center Expansion

Location
  • Surprise, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for the 1,300 SF Fitness Center Expansion at the Sunflower R.V. Resort in Surprise, Arizona. Expansion to be used for aerobic exercise equipment and will include in-floor power distribution. Design to be completed in 2007.

Broadway Recreation Center

 


Location
  • Mesa, Arizona

Year Completed
  • 2007

SUMMARY

HVAC and electrical engineering services for the replacement of the heating/ventilating units and the design of modifications to the other roof-mounted heating, ventilating, and air conditioning equipment to facilitate the upcoming reroofing project on the Broadway Recreation Center in Mesa, Arizona. Construction to be completed in 2007.

Dysart Elementary Recreation Building

 


Location
  • El Mirage, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for a new 11,000 SF Physical Education Facility to be located on the grounds of the Dysart Elementary School. The HVAC system consists of roof-top package heat pump units. Engineering services included design and specification of an energy management system (EMS) compatible with the Dysart School District EMS. Construction completed in 2007.

New Recreation Center at Sunset Hills

Location
  • El Mirage, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and electrical design for a new 14,000 SF Recreation Building to be located on the grounds of Sunset Hills Elementary School in the Dysart Elementary School District. The HVAC system consists of roof-top package heat pump units. Engineering services included the design and specification of an energy management system (EMS) compatible with the Dysart School District EMS. Construction completed in 2007.

Desert Ridge Community Building

Location
  • Phoenix, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing and fire protection design for the 10,000 SF Community Building and a 250 SF Pool Building at Del Webb’s Desert Ridge Community in Phoenix, Arizona. The Community Building includes a presentation kitchen, game room, living room, movement studio, fitness room, and locker rooms. Construction to be completed in 2007.

Grand Canyon Railway R.V. Park

Location
  • Williams, Arizona

Year Completed
  • 2006

SUMMARY

HVAC and plumbing design for a re-design of the Grand Canyon R.V. Park in Williams, Arizona. This project consisted of two buildings, Building One included a convenience store, a dog kennel, a cattery, and a manager’s apartment. Building Two included showers, restrooms, a residential laundry, a vending area, and a gas BBQ & fire pit area. Construction completed in 2006.

Festival Golf Maintenance Facility

Location
  • Sun City, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical design for the new 5,000 SF Festival Golf Maintenance Facility located in Sun City, Arizona. The HVAC system consists of split system heat pump units to serve the office/admin areas and evaporative coolers with gas unit heaters serving the maintenance bays. Construction completed in 2006.

Christ Evangelical Lutheran Church

 


Location
  • Goodyear, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical design for the 11,120 SF new Hall Building for Christ Evangelical Lutheran Church in Goodyear, Arizona. Construction completed in 2009.

Mission del Sol Presbyterian Church

 


Location
  • Tempe, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical design for a new 11,000 SF Worship Center at the Mission del Sol Presbyterian Church in Tempe, Arizona. Construction completed in 2009.

Superstition Springs Community Church

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing, fire protection, and electrical design for a new 30,000 SF Worship Center, a 12,000 SF Administration/Youth Activity Center and site improvements including new parking and driveway lighting at Superstition Springs Community Church. Construction completed in 2009.

Chandler Christian Church Remodel

 


Location
  • Chandler, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for a 9,000 SF renovation of the Sanctuary, and expansion of the existing platform and a 2,400 SF expansion of the existing lobby at Chandler Christian Church in Chandler, Arizona. Construction completed in 2009.

Canyon River Ranch Pumps

 


Location
  • Payson, Arizona

Year Completed
  • 2009

SUMMARY

Electrical engineering service for two (2) new well pumps and a new booster pump at the Canyon River Ranch Subdivision in Payson, Arizona. Construction completed in 2009.

Dinan Residence Electrical Service Upgrade

 


Location
  • Phoenix, Arizona

Year Completed
  • 2009

SUMMARY

Electrical engineering services for an upgrade of the 200 amp electrical service to a 400 amp service at the Dinan residence in Phoenix, Arizona. Design completed in 2009.

Las Casitas Assisted Living Facility

 


Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering for the 32,221 SF Assisted Living Facility for Las Casitas Properties in Mesa, Arizona. The project included three (3) similar 6,879 SF assisted living buildings and four (4) identical 2,896 SF duplex units. Construction completed in 2008.

Slessman Residence

 


Location
  • Scottsdale, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and electrical engineering services for the 10,495 SF single-family residence in Scottsdale, Arizona. Design completed in 2008.