Central Plants

WL Gore Echo Ridge Chiller Replacement

 

 


Location
  • Flagstaff, Arizona

Year Completed
  • 2016

SUMMARY

HVAC, plumbing and electrical engineering services for the evaluation and replacement of the chillers, pumps, and cooling towers (as needed) at the W.L. Gore Echo Ridge Facility in Flagstaff, Arizona.

WL Gore Woody Springs Chiller Replacement

 

 


Location
  • Flagstaff, Arizona

Year Completed
  • 2016

SUMMARY

HVAC, plumbing and electrical engineering services for the evaluation and replacement of the chillers, pumps, and cooling towers (as needed) at the W.L. Gore Woody Springs Facility in Flagstaff, Arizona.

SRP XCT Building #36 Central Plant & East Side HVAC Issues

 

 


Location
  • Phoenix, Arizona

Year Completed
  • 2014

SUMMARY

HVAC and electrical engineering services for the design of Upgrades to the SRP XCT Building #36 Central Plant and East Side HVAC system.

SRP East Valley Service Center Central Plant

 


Location
  • Phoenix, Arizona

Year Completed
  • 2013

SUMMARY

HVAC and electrical engineering services for the Central Plant, Thermal Storage Tank, and Chilled Water Piping Upgrades at the East Valley Service Center Facility.

Medtronic Building 3 & 4 Chilled Water Interconnection

 

 

 


Location
  • Tempe, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and structural engineering services for the design of a chilled water interconnection to enable Building #3 and 3A to be supplied with chilled water from the Central Plant in Building #4 at the Medtronic Facility in Tempe, Arizona.

Red Mountain High School Chiller & A/C Unit Replacement

 

 


Location
  • Mesa, Arizona

Year Completed
  • 2009

SUMMARY

HVAC and electrical engineering services for the replacement of two existing 250 ton water cooled chillers serving the 145,000 square foot Classroom Building with two new Smardt Turbo Core chillers and the 20 packaged rooftop air conditioning units serving the 55,000 square foot Gymnasium Building with 20 new units at Red Mountain High School for the Mesa Unified School District, in Mesa, Arizona.

Modifications to Mechanical Systems at Webster Elementary School

 

 

 


Location
  • Mesa, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the replacement of the existing water cooled chiller and cooling tower with a new water cooled chiller and cooling tower to serve the approximately 41,000 S.F. Webster Elementary School for the Mesa Unified School District, in Mesa, Arizona.