Government/Public Projects

CAP Power Systems Design Report

Location
  • Phoenix, Arizona

Year Completed
  • 2015

SUMMARY

HVAC, plumbing and electrical engineering services for a Design Concept Report (DCR) including the Standby Power Systems at 38 Check Structures, 33 Turnouts and 8 Mountain Top Microwave Communication sites.

City of Mesa CNG Project-East Facility

Location
  • Mesa, Arizona

Year Completed
  • 2014

SUMMARY

HVAC, plumbing and electrical engineering services for Task 2A which includes a 4-Bay expansion of the existing garage and Task 4A which includes a new 5,000 SF Crew Building.

City of Mesa Elevator Remodel

Location
  • Mesa, Arizona

Year Completed
  • 2011

SUMMARY

HVAC, plumbing, electrical engineering, and elevator consulting services for the Modernization of eleven existing elevators at 6 Buildings including the Communications Building, Police Central, the Information Technology Building, Buildings B & C at the Convention Center, and Mesa City Plaza in Mesa, Arizona.

Chandler Large Equipment Wash Bay

Location
  • Chandler, Arizona

Year Completed
  • 2009

SUMMARY

Plumbing and electrical engineering services for the new 2,400 SF Large Equipment Wash Bay for the City of Chandler Streets Department in Chandler, Arizona. Construction completed in 2009.

Chandler Large Equipment Wash Bay

Location
  • Chandler, Arizona

Year Completed
  • 2009

SUMMARY

Plumbing and electrical engineering services for the new 2,400 SF Large Equipment Wash Bay for the City of Chandler Streets Department in Chandler, Arizona. Construction completed in 2009.

Dysart Transportation Facility

 


Location
  • El Mirage, Arizona

Year Completed
  • 2009

SUMMARY

HVAC, plumbing and electrical engineering services for the new 84,000 SF Dysart Transportation Facility for the Dysart Unified School District. This project included the design of a complete HVAC system using a combination of packaged rooftop heat pump units and split system units for the new Office/Training Building, packaged rooftop heat pump units for the Kitchen/Dining Area and evaporative coolers with electric unit heaters for the maintenance bays. AZPE coordinated with the Vendor a completed maintenance piping system with hose reels providing compressed air, motor oil, transmisstion oil, water and grease. An oil recovery system and underground vehicle exhaust system was also included. AZPE also coordinated with the Vendor a complete fueling system including 20,000 gallon diesel oil tank and a 10,000 gallon unleaded gas tank. The fuel pumping stations were to be provided with card readers. Construction completed in 2009.

Honeywell Deer Valley Facility Hangar Cooling Study

 


Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC and electrical design for the preparation of a study to determine how much cooling the existing building electrical system can support and what indoor temperature and humidity that amount of cooling can maintain in the Hangar Building at Honeywell’s Deer Valley Facility in Phoenix, Arizona. Study completed in 2008.

Tucson Air Force Base Vehicle Wash Rack

Location
  • Tucson, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the new Vehicle Wash Rack at the Air Force Base in Tucson, Arizona. Construction completed in 2008.

Carwasher Facility

 


Location
  • Phoenix, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for a new Carwasher Facility in Phoenix, Arizona. The project included two buildings (2,500 SF and 6,400 SF) and two canopies (2,700 SF and 6,800 SF), all located on a two-acre site. AZPE worked directly with the Owner to prepare signed and sealed water calculations for the water reclaim system suitable for City review. Design completed in 2008.

Ryan's Express Transportation

 


Location
  • Tempe, Arizona

Year Completed
  • 2008

SUMMARY

HVAC, plumbing and electrical engineering services for the new 6,050 SF Office/Bus Repair Facility for Ryan’s Express Transportation in Tempe, Arizona. This project included a 4,300 SF bus repair area on the ground floor and a 1,750 SF office space on the second floor. Design completed in 2008.

Goodyear Airport Hangar 18 Code Analysis

Location
  • Goodyear, Arizona

Year Completed
  • 2007

SUMMARY

HVAC, plumbing, fire protection and electrical engineering services for a code analysis of Hangar 18 at the City of Phoenix Goodyear Airport. Study completed in 2007.

Hohokam Hospital Vehicle Wash Shed

Location
  • Sacaton, Arizona

Year Completed
  • 2007

SUMMARY

Plumbing and electrical engineering services for the addition of a 480 SF Vehicle Wash Shed at Hohokam Hospital in Sacaton, Arizona for the Gila River Indian Community. Construction completed in 2007.

ADOT Flagstaff De-Icer Building Exhaust Review

 


Location
  • Flagstaff, Arizona

Year Completed
  • 2007

SUMMARY

HVAC engineering services for a review of exhaust system modifications proposal by the Contractor for the ADOT De-Icer Building in Flagstaff, Arizona. Study completed in 2007.

SRP Pinal County Call Center Facility

Location
  • Pinal County, Arizona

Year Completed
  • 2006

SUMMARY

HVAC, plumbing and electrical engineering services for the new 60,000 SF Salt River Project (SRP) Call Center Facility in Pinal County.

City of Phoenix Transit Operation Facilities Refurbishments

 


Location
  • Phoenix, Arizona

Year Completed
  • 2005

SUMMARY

Mechanical and electrical design for the installation of new bus interior cleaning systems at both the North and South Transit Operating Facilities. This work included coordinating the location and rating of the new vacuum systems with the existing bus fueling islands. This project also included replacement of a failed main electrical breaker at the North Facility. Construction completed in 2005.

ADOT Seligman Vehicle Wash Facility

 


Location
  •  Seligman, Arizona

Year Completed
  • 2001

SUMMARY

ADOT Seligman Vehicle Wash Facility

HVAC and plumbing design for a 1,500 SF semi-enclosed vehicle wash facility in Seligman, Arizona. The design included a high-pressure hot water washing system, a special sand and oil interceptor, and a gas-fired radiant heating system. Construction completed in 2001.

ADOT Williams Vehicle Wash Facility

 


Location
  • Williams, Arizona

Year Completed
  • 2001

SUMMARY

HVAC and plumbing design for a 1,500 SF semi-enclosed vehicle wash facility in Williams, Arizona. The design included a high-pressure hot-water washing system, a special sand and oil interceptor and a gas-fired radiant heating system. Construction completed in 2001.

ADOT Kingman Vehicle Wash Facility

 


Location
  • Kingman, Arizona

Year Completed
  • 2001

SUMMARY

HVAC and plumbing design for a semi-enclosed vehicle wash facility in Kingman, Arizona. The design included a high-pressure hot water washing system, a high capacity sand and oil interceptor, and a gas-fired radiant heating system in the Wash Bay. Construction completed in 2001.