High-Tech & Industrial
New Flight Simulator Addition
LOCATION:
Phoenix, Arizona
COMPLETED:
2021
SUMMARY:
Design new systems in support of new hydraulic flight simulator.
Projects
LOCATION:
Tempe, Arizona
COMPLETED:
2021
SUMMARY:
Design of supporting equipment to support new wheelabrator (abrasive blasting equipment), including new dust collector.
LOCATION:
Mesa, Arizona
COMPLETED:
2019
SUMMARY:
Design of new air compressor building to house three 150-hp Air compressors and Dryers.
LOCATION:
Mesa, Arizona
COMPLETED:
2019
SUMMARY:
Remodel of approximately 10,000 sf to convert to weld shop. This included snorkel exhaust, dust collector and process gases.
LOCATION:
Apache Junction, Arizona
COMPLETED:
2008
SUMMARY:
Design of new facility that included 35,000 SF heavy equipment service building, 7,500 sf remote wash building and 7,000 sf canopy.
LOCATION:
Tempe, Arizona
COMPLETED:
2021
SUMMARY:
Relocation from two existing facilities to one new 97,000 sf building. Project included large production area and office space.
LOCATION:
Undisclosed
COMPLETED:
2021
SUMMARY:
Design of new ultra-pure water system.