Office Projects
AZ Water Company Office Building
Location
- Oracle, Arizona
Year Completed
- 2014
SUMMARY
HVAC, plumbing and electrical engineering services for the design of a new 2,500 SF (approximately) Office Building for the Arizona Water Company in Oracle, Arizona.
Pineview Production TI's
Location
- Mesa, Arizona
Year Completed
- 2010
SUMMARY
HVAC, plumbing and electrical engineering services for the Pineview Production Tenant Improvements in Mesa, Arizona. This includes four (4) 42,244 SF buildings with identical tenant improvements, and two (2) 25,065 SF buildings with non-identical tenant improvements (219,106 SF total). Also included is a 1000-car parking lot.
Scottsdale Insurance Company Infrastructure Upgrades
Location
- Scottsdale, Arizona
Year Completed
- 2012
SUMMARY
HVAC, plumbing and electrical engineering services for the Infrastructure Upgrades Project at the Scottsdale Insurance Company main campus in Scottsdale, Arizona. The total project area is approximately 162 KSF.
Insight Carver Drive Renovation
Location
- Phoenix, Arizona
Year Completed
- 2007
SUMMARY
HVAC, plumbing, fire protection and electrical engineering services for the renovation of 70,000 SF of existing office/warehouse space into 64,045 SF of high density office and 5,955 SF of cafeteria/kitchen space.
Origami Owl Headquarters
Location
- Chandler, Arizona
Year Completed
- 2013
SUMMARY
HVAC, plumbing, fire protection and electrical engineering services for the new 64,000 SF (approximately) Tenant Improvements in the existing grey shell building for the Origami Owl Headquarters in Chandler, Arizona.
Karsten Building 113 Second Floor TI
Location
- Phoenix, Arizona
Year Completed
- 2010
SUMMARY
HVAC, plumbing and electrical engineering services for the new 60,700 SF office-type tenant improvement on the second floor of Building 113 for Karsten Manufacturing Corporation in Phoenix, Arizona.
SRP PBF Remodel
Location
- Tempe, Arizona
Year Completed
- 2010
SUMMARY
HVAC, plumbing and electrical engineering services for the remodel of the 13,000 SF 3-story building at Salt River Project’s (SRP’s) Papago Buttes Facility (PBF) located in Tempe, Arizona. In addition, the project included the remodel of an existing modular trailer building adjacent to the 3-story building. AZPE designed and specified modifications to the HVAC system using water-source heat pump units and unitary air conditioning units. The unitary units were used primarily as redundant air conditioning systems in mission-critical environments. AZPE analyzed the existing emergency power system to determine the need for an additional generator and provided the design and specification for a new uninterruptable power supply (UPS) system to replace the existing system. Construction completed in 2010.
8521 E. Princess COLO Remodel
Location
- Scottsdale, Arizona
Year Completed
- 2009
SUMMARY
HVAC and electrical engineering services for the 5,000 SF remodel of existing office space into collocation (COLO) space and the conversion of the existing Lunch Room into a UPS Room at IO Capital Princess in Scottsdale, Arizona. Construction completed in 2009.
City of Mesa South Center Campus Building 3 ADA Upgrades
Location
- Mesa, Arizona
Year Completed
- 2009
SUMMARY
Plumbing and electrical engineering services for ADA upgrades to the 24,700 SF City of Mesa Center Campus Building #3 in Mesa, Arizona. Design included a complete fire alarm system to upgrade the existing emergency system. Construction completed in 2009.
Rendezvous Center HVAC Replacement
Location
- Mesa, Arizona
Year Completed
- 2009
SUMMARY
HVAC and electrical engineering services for the replacement of the HVAC systems in the existing 14,000 SF City Mesa Rendezvous Center Building in Mesa, Arizona. AZPE designed and specified multizone air-handling units, new air-cooled chillers and corrsponding pumps and an emergency management system (EMS) compatible with the City of Mesa EMS. Construction completed in 2009.
Storables at Dana Park TI
Location
- Mesa, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing and electrical design for a new 16,000 SF Storables retail store in Dana Park Village Square, Building 6 in Mesa, Arizona. The tenant improvement includes exposed round ductwork and a metal framing grid to support general overhead lighting and specialty display lighting. Design completed in 2008.
SRP Power Operations Building Expansion
Location
- Scottsdale, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing and electrical design for the 25,000 SF expansion to the existing 58,000 SF Power Operations Building in Scottsdale, Arizona. This project included relocation of the Distribution Operations Center into the expansion as well as the installation of new chillers and cooling towers in the existing dual, redundant chilled water central plants. Construction completed in 2008.
SRP Power Operations Building Expansion Study
Location
- Scottsdale, Arizona
Year Completed
- 2008
SUMMARY
HVAC and electrical study prepared for Salt River Project to determine the feasibility of adding a 25,000 SF expansion to the existing 58,000 SF Power Operations Building in Scottsdale, Arizona. This study included an analysis of the existing dual, redundant chilled water central plants, and the normal and back-up power sources with recommendations for their expansion. Study completed in 2008.
Insight Carver Drive Relocation
Location
- Tempe, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing and electrical design for the renovation of 70,000 SF of existing office/warehouse space into 64,045 SF of high density office area with 6 large meeting rooms and 5,955 SF of cafe space in Tempe, Arizona. The renovation is an energy-efficient LEED Commercial Interiors Certified Project. It includes an emergency generator and UPS system for the critical information technology (IT) equipment. Construction completed in 2008.
Sara Lee Office/Warehouse TI
Location
- Phoenix, Arizona
Year Completed
- 2008
SUMMARY
HVAC and plumbing design for a 75,000 SF office/warehouse tenant improvement in Phoenix, Arizona. The project included 10,000 SF of two-story office space and 65,000 SF of warehouse space. Design completed in 2008.
SRP Power Operations Building Central Plant Controls Upgrades
Location
- Scottsdale, Arizona
Year Completed
- 2008
SUMMARY
HVAC and electrical design for upgrades to the HVAC control system at Salt River Project’s Power Operations Building in Scottsdale, Arizona. This building has two, redundant chiller plants. A new control system was provided in each chiller plant to eliminate a single point of failure that could take down both plants. The new control systems control the equipment within each plant as well as monitor the other chiller plant for failure, to enable a seamless changeover from one plant to the other. New sequences of control were written to make use of redundant chilled water loops and redundant cooling towers and chillers. This project also included replacing pneumatically operated valves with new electric/electronic valves as well as commissioning of the new control system. Project completed in 2008.
SPR Power Operations Building Expansion
Location
- Scottsdale, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing and electrical design for the 25,000 SF expansion to the existing 58,000 SF Power Operations Building in Scottsdale, Arizona. This project included relocation of the Distribution Operations Center into the expansion as well as the installation of new chillers and cooling towers in the existing dual, redundant chilled water central plants. Construction completed in 2008.
Knight Transportation North Building Executive Offices
Location
- Phoenix, Arizona
Year Completed
- 2008
SUMMARY
HVAC and plumbing engineering services for the 19,400 SF remodel of the executive offices at Knight Transportation’s Headquarters in Phoenix, Arizona. Design modifications were made to the new water-source heat pump system to properly condition the Executive Office Area. Construction completed in 2008.
Toyota Financial Services Chandler 2nd Floor TI
Location
- Chandler, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing and electrical design for the 32,000 SF remodel at Toyota Financial Services’ Call Center in Chandler, Arizona. Construction completed in 2008.
Ingleside Animal Hospital
Location
- Phoenix, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing, fire protection and electrical engineering services for the 10,000 SF Ingleside Animal Hospital at 48th Street and Thomas in Phoenix, Arizona. Design included a complete HVAC system using packaged rooftop equipment, medical vacuum piping system, oxygen and anesthsia system, and performance-type specifications for a fire sprinkler system. Construction completed in 2008.
DPAIRCORP Corporate Office
Location
- Phoenix, Arizona
Year Completed
- 2008
SUMMARY
HVAC and plumbing engineering services for the 8,600 SF Tenant Improvement of the DPAIRCORP Corporate Office in Phoenix, Arizona. Construction completed in 2008.
Peoria High School New Admin/Media Center
Location
- Peoria, Arizona
Year Completed
- 2008
SUMMARY
HVAC and plumbing design for the new 18,000 SF Administration Building and Media Center at Peoria High School in Peoria, Arizona. Construction completed in 2008.
New Empire Machinery Training Facility TI
Location
- Mesa, Arizona
Year Completed
- 2008
SUMMARY
HVAC, plumbing and electrical design for the approximate 35,500 SF tenant improvements for the New Empire Training Facility in Mesa, Arizona. Construction completed in 2008.
Highwind Network Operation Center Remodel
Location
- Phoenix, Arizona
Year Completed
- 2007
SUMMARY
HVAC engineering services for the 2,000 SF remodel of an office area into a Network Operation Center on the 2nd Floor of Highwind Network Group’s Facility at 3300 N. Central Avenue in Phoenix, Arizona. AZPE designed and specified an overhead air distribution system using chilled water fan-coil units mounted outside of the NOC area. Construction completed in 2007.
Blucor Contracting Office TI
Location
- Mesa, Arizona
Year Completed
- 2007
SUMMARY
HVAC, plumbing and electrical engineering services for 3,200 SF professional office tenant improvements in the two-story Blucor Contracting Office Building at 6939 E. Parkway Norte 4 in Mesa, Arizona. Design was completed in 2007.
Dana Park Village Square – Phase 3
Location
- Mesa, Arizona
Year Completed
- 2007
SUMMARY
HVAC, plumbing and electrical design for engineering services for 116,494 SF of gray-shell retail space. The project included numerous features to expedite the construction of future tenant improvements including the installation of 105 rooftop heat pump units, exhaust vents on the roof, domestic water and sewer taps, and pre-installed grease interceptors for restaurant tenants. The electrical system included seven service entrance sections (two 1600 amp, four 2000 amp, and one 2500 amp) with multiple meter sockets for future tenant use. Construction completed in 2007.
SRP Pinal County Call Center Facility
Location
- Pinal County, Arizona
Year Completed
- 2007
SUMMARY
HVAC, plumbing and electrical design for the new 60,000 SF Salt River Project Call Center Facility in Pinal County. This project included performing computerized energy modeling of the building envelope, HVAC systems, plumbing systems, and lighting systems to establish a base-line energy consumption and to estimate the energy savings for various LEED-eligible modifications. Design completed in 2007.
GoDaddy Tempe Call Center M&E Upgrades
Location
- Tempe, Arizona
Year Completed
- 2007
SUMMARY
HVAC and electrical design for mechanical and electrical upgrades to GoDaddy’s 75,000 SF Tempe, Arizona Call Center. Upgrades included replacing the reconfiguring the existing Systems furniture to add an additional 250 people to the building and the installation of a UPS and standby generator. Design completed in 2007.
Toyota Financial Services Chandler 1st Floor TI
Location
- Chandler, Arizona
Year Completed
- 2007
SUMMARY
HVAC, plumbing and electrical design for the 27,300 SF tenant improvement at Toyota Financial Services’ Call Center in Chandler, Arizona. Design completed in 2007.
Salt River Project’s Tempe Service Center New Administration Building
Location
- Tempe, Arizona
Year Completed
- 2006
SUMMARY
HVAC, plumbing and electrical design for a 30,000 SF New Administration Building, and Demolition of the 14,000 SF Old Warehouse Building at Salt River Project’s Tempe Service Center in Tempe, Arizona. Construction completed in 2006.
Surprise City Hall HVAC Upgrades
Location
- Surprise, Arizona
Year Completed
- 2005
SUMMARY
HVAC, plumbing and electrical design for the 19,000 SF renovation of building ‘D’ at the Surprise City Hall Complex. Building ‘D’ includes the Mayor’s Office, Council Chambers, Purchasing, City Manager’s Office and the City Attorney’s Offices. This project involved replacement of the existing HVAC system, and replacement of the electrical service entrance section, including addition of a stand-by generator for the City’s IT systems. Construction completed in 2005.
Bank One Operations Center Fault Current Study and Circuit Breaker Coordination
Location
- Phoenix, Arizona
Year Completed
- 2003
SUMMARY
A complete Fault Current Study was performed in SKM Power Engineering Software to identify available fault current at each electrical system bus. Then a Circuit Breaker Coordination was performed and electronic trip unit settings were specified for all of the overcurrent devices in the electrical system. Study completed in 2003
DHL Worldwide Express, Inc., Scottsdale Data Center
Location
- Scottsdale, Arizona
Year Completed
- 2002
SUMMARY
HVAC and plumbing design for a 100,000 SF tenant improvement including 20,000 SF of data center, 5000 SF of data center support area and 75,000 SF of office space. The office space included a limited service kitchen, cafeteria, open office area, private offices, conference rooms, and video conference rooms. Construction completed in 2002.
W. L. Gore, Elden View Renovation
Location
- Flagstaff, Arizona
Year Completed
- 2002
SUMMARY
HVAC, plumbing, and fire protection design for the renovation of a 53,000 SF building into 26,000 SF of office space and 27,000 SF of warehouse space at the W. L. Gore, Elden View Facility in Flagstaff, Arizona. Construction completed in 2002.
On Semiconductor Building “B” Third Floor Remodel
Location
- Phoenix, Arizona
Year Completed
- 2000
SUMMARY
HVAC, plumbing, and fire protection conceptual design and construction documents for the remodel of approximately 20,000 SF into office and large conference space at the On Semiconductor Facility in Phoenix, Arizona. Prior to the remodel, the space had been used for semiconductor manufacturing. Construction completed in 2000.
4041 N. Central, Cooling Evaluation
Location
- Phoenix, Arizona
Year Completed
- 2000
SUMMARY
Investigation of the 1400 ton chilled-water central plant serving 18 large air handling units in this Phoenix, Arizona high rise office building. This included extensive measurement of chilled water flow rates, condenser water flow rates, water pressure drops, and temperature differentials. A written report was prepared with recommendations to increase the cooling capacity and efficiency of the central plant in a cost-effective manner. Evaluation completed in 2000.
Harris Trust Bank at 24th Street and Camelback
Location
- Phoenix, Arizona
Year Completed
- 2000
SUMMARY
HVAC and plumbing design for approximately 9,700 SF of upscale tenant improvements in a large mid-rise building in Phoenix, Arizona. Construction completed in 2000.
Microsoft Sales Center T.I.
Location
- Phoenix, Arizona
Year Completed
- 1999
SUMMARY
HVAC and plumbing design for approximately 10,000 SF of tenant improvements in a high rise office building in downtown Phoenix. The improvements included a data center, multiple large conference rooms, and training centers. Construction completed in 1999.*
ShopCo Retail Stores
Location
- Green Bay, Wisconsin
Year Completed
- 1999
SUMMARY
Power, lighting, fire alarm and control systems design for a proto-type big-box store that could be easily adapted to any site in the nation. Duties included meeting with the Client in Greenbay, Wisconsin to establish the most cost efficient construction methods. Two site-adapted designs for stores located in the Mid-Western US were also completed. Design completed in 1999.*
Harris Trust Bank at 24th Street and Camelback
Location
- Phoenix, Arizona
Year Completed
- 2000
SUMMARY
HVAC and plumbing design for approximately 9,700 SF of upscale tenant improvements in a large mid-rise building in Phoenix, Arizona. Construction completed in 2000.
Exxon, Chevron and Mobile Combination Store and Gas Stations
Location
- Phoenix, Arizona
Year Completed
- 1999
SUMMARY
Power, lighting, fire alarm and control systems design for multiple proto-typical sites. Several designs were produced to allow for the addition of a car wash, lube bay or other equipment. Several local site adapted designs were also completed. Design completed in 1999.*
Kierland Commons Office Park
Location
- Scottsdale, Arizona
Year Completed
- 2000
SUMMARY
Electrical site utility design, and power, lighting and fire alarm systems design for 12-one, two and three story shell office/retail buildings at the Scottsdale Kierland Commons Office Park. TI electrical design was also provided for some office space, and first floor retail space. Construction completed in 2000.*
Palm Valley Office Park
Location
- Litchfield Park, Arizona
Year Completed
- 1999
SUMMARY
Power, lighting, fire alarm and site electrical utility design for a three-story office shell building located in Litchfield Park, Arizona. Design and construction completed in 1999.*
City of Glendale City Hall Complex
Location
- Glendale, Arizona
Year Completed
- 1999
SUMMARY
Extensive evaluation of existing power and lighting systems including inspection, current readings and infrared scanning of electrical panel interiors, from the service entrance section to the last panel in the distribution system. A report of the findings was prepared and presented to the Client. Evaluation completed in 1999.*
* Indicates individual project design experience of Steven F. Durand, Rodney L. Hillis, Philip J. Mouw, William Bergman or Scott E. Woods.