Water & Wastewater Projects
City of Mesa Signal Butte Water Treatment Plant
Location
- Mesa, Arizona
Year Completed
- 2014
SUMMARY
HVAC, plumbing and electrical engineering services for the design of a new 13,500 SF (approximately) Administration Building at the Signal Butte Water Treatment Plant in Mesa, Arizona
Palm Valley Water Reclamation Facility Expansion
Location
- Palm Valley, California
Year Completed
- 2015
SUMMARY
HVAC and electrical engineering services for the expansion of the Palm Valley Water Reclamation Facility to 6.55 MGD.
Cottonwood WWTP Blower Building Cooling System
Location
- Cottonwood, Arizona
Year Completed
- 2007
SUMMARY
HVAC and electrical design for an evaporative cooling system for the 872 SF Blower Building at the Cottonwood Wastewater Treatment Plant in Cottonwood, Arizona. Design completed in 2007.
Black Mountain Sewer Company Odor Control Study
Location
- Carefree, Arizona
Year Completed
- 2007
SUMMARY
Preparation of an odor control study for the Black Mountain Sewer Company’s wastewater treatment plant located in the middle of Boulders Resort in Carefree, Arizona. Study included an analysis of the field conditions and recommendations to reduce the fugitive emissions from the plant. Study completed in 2007.
Silverbell Army Heliport WWTP
Location
- Marana, Arizona
Year Completed
- 2007
SUMMARY
Electrical and mechanical design for the installation of a 0.08 mgd sequencing batch reactor waste water treatment plant at the Army’s Silverbell Heliport in Marana, Arizona. Design included a stand-by power generator for the plant. Construction completed in 2007.
Stetson Hills Potable Water Booster Station
Location
- Phoenix, Arizona
Year Completed
- 2007
SUMMARY
HVAC and plumbing design for the chlorination and testing building at the potable water booster station in the Stetson Hills development in Phoenix, Arizona. Construction completed in 2007.
Avondale WWTP Blower Intake Cooling System
Location
- Avondale, Arizona
Year Completed
- 2005
SUMMARY
HVAC, plumbing, and electrical design for a system to provide cool intake air for the process air blowers at the Avondale, Arizona wastewater treatment plant. The existing blowers were not providing sufficient process air during the summer months due to a decrease in the air density caused by the high ambient temperature. Design completed in 2005.
Anthem WWTP Phase 3 Plant Expansion
Location
- Anthem, Arizona
Year Completed
- 2004
SUMMARY
HVAC and plumbing design for the expansion of the wastewater treatment plant operated by Arizona-American Water Company in Anthem, Arizona. The design included an odor control system for the expansion of the treatment basins. Cooling systems were provided for various electrical rooms and the process blower building. Construction completed in 2004.
Anthem WTP Buildout Plant Expansion
Location
- Anthem, Arizona
Year Completed
- 2003
SUMMARY
Anthem WTP Buildout Plant Expansion
HVAC and plumbing design for the 2.0 mgd expansion of the water treatment plant operated by Arizona-American Water Company for the Anthem Community north of Phoenix, Arizona. The design included a special 1,260,000 BTU/Hr water heating system to facilitate the cleaning of membranes used in the water purification process. Construction completed in 2003.
Show Low WWTP Headworks Enclosure
Location
- Show Low, Arizona
Year Completed
- 2001
SUMMARY
HVAC design of a heating and ventilating system for the headworks enclosure at the Wastewater Treatment Plant for the City of Show Low, Arizona. Included in this design was a unique odor-reducing exhaust system. Construction completed in 2001.
Phoenix 23rd Avenue WWTP Natural Gas System
Location
- Phoenix, Arizona
Year Completed
- 2001
SUMMARY
Documentation and evaluation of the natural gas distribution system serving the City of Phoenix 23rd Avenue Wastewater Treatment Plant. Design of a new 10 PSIG medium pressure natural gas service for two (2) 711 HP engine-driven blowers and one (1) 798 HP engine-driven blower in the Blower Building. Construction completed in 2001.